I always IR test between all and also test all between Line (Live) and Line, Neutral & Neutral (looking for borrowed neutrals and Lines)

Then install all and then full test after.
 
Electricity can kill, if you change the characteristics of an installation by changing a consumer unit you are then responsible for its safe and correct opperation and the integrity of the circuits that you reconnect.

If someone is injured or or dies due to negligence I think there is an inevitibility of trouble for the installer of the new consumer unit.

How long was your training? Mine was 4 years............
 
The op said hes never carried out a cu change but passed his elecsa assessment. strange !

Nothing strange about I have been saying this for long enough if you have a heart beat and pay the subs any Schemie will badge you as good to go remember its about bagging members not filtering people
 
The op said hes never carried out a cu change but passed his elecsa assessment. strange !

Nah not really he's paid his money give him his badge, that's the way it is, nobody fails, were all like muttly on the wacky races MEDAL MEDAL MEDAL.

does anybody know of anyone who's failed???????
 
My assessor wasnt interested hot drink or biscuits he was like in bang and out. 1 hr! To be fair on him I am spot on with all my testing and could reel off all the figures he wanted from memory e.g max Zs values, trip times for RCDs i'm like rainman with that stuff haha
 