K
Knobhead
That statement should be treated with the contempt it deserves!!
The ''As Fitted'' or more commonly shown as an ''As Built'' stamp on drawings means that the drawing has gone through a system of checking by a supervisory body from initial concept drawings to final As Built status. If that installation has been altered over time by professionally inept or cowboy contractors, that haven't shown or noted any changes made to any said drawing, that's another matter altogether.
As on any older installation where it's evident that alterations have been made, you as a qualified electrician should be undertaking you're own checks and balances for any changes that may of been made.
The signed stamp ''As Fitted'' or ''As Built'' designation on a drawing, is a final legal and contractual document on the initial installation...
E54 with respect, sorry I can’t agree with:
''As Built'' stamp on drawings means that the drawing has gone through a system of checking by a supervisory body from initial concept drawings to final As Built status.
I’ve wasted weeks of my life checking and correcting f**k ups made by drawing offices.
I’ll not just vent my spleen on electrical draughtsmen, mechanical are as bad. We had a draughtsman with the initials BAW (Burn And Weld).
I took delivery of a five new MCC’s. I refused to accept them. No way, No how, would they have worked! The up shot was I ripped them to pieces and rebuilt them on site, doing the drawings as I went along.