C
ch1
Hi folks,
Just started my Part P with OLCI and I'm wondering if I will be able to sign off work on my own house? Just bought a bungalow that according to the home report will need some upgrading to the electrics. As money is tight and there's a lot of other work needing done I'm hoping to do this myself. I've been told by a mate this won't be possible but need to know the cheapest way of getting the house habitable (+ safe!)
Cheers!
Chris
Just started my Part P with OLCI and I'm wondering if I will be able to sign off work on my own house? Just bought a bungalow that according to the home report will need some upgrading to the electrics. As money is tight and there's a lot of other work needing done I'm hoping to do this myself. I've been told by a mate this won't be possible but need to know the cheapest way of getting the house habitable (+ safe!)
Cheers!Chris
...do the work over a period of time, and test it properly. Produce EIC/MWC for work (dependent upon type of work), send it to BC with copy of your qualifications in electrics.
