Letting by = leakage

These fittings were fitted post contract by another contractor and the original replacement dimmer was fitted by one of our sparks who was on a 1st fix containment job near the site so did not have his IR tester and he has been re-educated,

an RCD letting go = operating

For Re-educated do we read, Kicked in the A**:tounge_smile:
 

OFFICIAL SPONSORS

Back
Top