S
Specialist
Letting by = leakage
These fittings were fitted post contract by another contractor and the original replacement dimmer was fitted by one of our sparks who was on a 1st fix containment job near the site so did not have his IR tester and he has been re-educated,
an RCD letting go = operating
For Re-educated do we read, Kicked in the A**:tounge_smile: