J
jamie s
Wondering if anybody can give advice on a certain problem. I have been asked to look at 3 way switching that has been 1st fixed and needs connecting. The live/switch live is fed into switch 1 and there are 2 3core cables going from switch 1, 1 to switch 2 and one to switch 3. I am aware this isn't right but as the client has already plastered, painted etc i would like to know if there is a way around this without adding a cable from switch 2 to switch 3. Hope this makes sense and hope somebody can help