Plug in solar with a ring final?

"Plug and play" suggests to the general public that they can go to shop, buy it, plug it in, and get going saving the planet... They will not read the instructions... they will not check they have an RCBO, whatever type... They will not care about any G98, or a Smart meter.
I tend to agree. As it stands, G98 is required within 28 days of being installed, but plug and play is not installed, the whole idea is it can be moved home to home.
 
I tend to agree. As it stands, G98 is required within 28 days of being installed, but plug and play is not installed, the whole idea is it can be moved home to home.
About 20 years ago there was a 1kw wind turbine marketed for about £1k - amongst other places B&Q promoted it. David Cameron had one on the roof of his urban house where it flapped around producing nothing. One of the key initial attributes was that it was going to be plug in via a normal 13A plug - thus saving the installation cost of an electrician. I spoke to the manufacturer at a renewable energy exhibition in Aberdeen & seem to recall they were having difficulty getting this aspect approved.

I don't know how / if they ever resolved this aspect but they went bust not long after - the whole thing seemed unviable. One issue they had was lime mortar - apparently this tended to be shaken loose by the machine's vibration, necessitating a survey, adding to cost.

I actually scrounged one of these for my son's primary school in the Highlands, but it was never installed. A "proper" Proven Engineering machine shed a blade around that time, leading to a lack of enthusiasm for ours being installed. I gave it to a friend who is still to get around to installing it. I'm 99% sure it was hard wired.

Sorry for this slightly OT ramble......
 
Last edited:
I remeber them, as I recall even in a good location the payback time was longer than the expected machine life.
More virtue signalling than practical - so I imagine a ready market of people happy to "invest".
 
AI tells me: "The legal change is expected to permit plug-in systems with a maximum capacity of 800W" which is presumably where the 3.5A comes from? Will more than one be permitted (though how would you ensure that - perhaps through inverter design?)
I wonder how safety (eg the widow maker) will be ensured!
Re legal challenge, the legislation The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026 was laid before Parliament on July 17, 2026 and will come into force on August 27, 2026.
 
Re legal challenge, the legislation The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026 was laid before Parliament on July 17, 2026 and will come into force on August 27, 2026.
And the 'interim' specification for these products (interesting reading if you have time) is here:
 
In the main, plug in solar allows those in the rental sector to get some solar power, those who are owner occupied can fit systems needing holes drilled in the wall, and can use systems that allow batteries, so owner occupiers would be better off with the hard-wired options, using a battery.

So the question is, how does the tenant know if they can use the outside socket for plug in solar, will there be a chair for prospective buyers to still down and read the installation instructions before buying? It seems unlikely, so if they have an outside socket, then they will use it, once bought it is unlikely they will say Oh dear, my home does not fall into the criteria, I should take this back.

So it will be up to the landlord to label any outdoor socket not suitable for plug in solar as not suitable for plug in solar, same with use to charge an EV, if not marked as unsuitable, they will be used.
 
It seems interest has waned, once it was announced batteries not included, so half the production likely given away, people seem to have shelved the idea. And I note my own solar panels are now producing a lot less, the output in Winter likely means March or April before anyone fits them, each waiting for someone else to try them first.

For me, yes likely will work, as already got a battery, and already have the MPAN number so paid for export. But unless one already has solar, the plug in idea seems dead.
 
Seems another nail in the coffin, can't mount it on wood, and strict distances it can be away from the wall or roof.

So mounting on the fence or shed is out, and angling it to catch the sun better is out.

It would seem to me that the government realises they made an error, so are pilling up the barricades to stop it.

Note:- Only the plug and prey type, these rules don't, it seems, apply to a pro install.
 
Do we really think anuone will take any notice of restrictions ?
People will mount them wherever they feel like - on fences & sheds, angled to work better, all restrictions ignored and no landlord permissions asked.
 
Yes, I would not ask any permission, if I saw them on sale in the likes of Lidi, I would likely read what is on the outside of the packet, but if not bought, likely not there when I return, so no real option to ask a landlord or consult and planning document, and once bought, then anything in the instructions found inside the box, are not going to stop one fitting it.

After all it's all temporary, nothing hard-wired, same as a kettle or a drill. And I did read the instructions on Screwfix and B&Q own brand of battery drill, it says don't leave the charger unattended, yes, and I am really going to stand there watching the batteries charge.

We all know how to use instructions, only if all else fails do you read them
 
View attachment 124539I know this is unlikely, but it shows how we could have 35 amp on a cable designed for 20 amps, why has plug in solar been allowed? I can see with a radial system as used in the rest of Europe that a 20 amp cable with a 16 amp overload that cable is unlikely to be overloaded, but with the British ring final, it can cover a far bigger area, so more likely to have multi plug in solar devices. Having a plug on the supply was always called the widow maker, with say 4 plug in solar arrays into one extension lead, are we sure there will be no islanding?
Please correct me but do the new regs not say that only one circuit at a time can be used with plug-in-solar so a ring constitutes a single circuit just as though it was a radial. Whilst you are right some idiot might want to plug several in at the same time whilst the ring is fully loaded consider that the solar is not actually loading the ring its reducing its load that the purpose of plug-in-solar. One cannot ignore diversity factor, what's the likelihood of there being as many plug-ins as you fear at £400 a pop. These plug-in-solar GTI are AC connected unlike the usual Chinese ones that are DC connected, the latter leak earth currents that can saturate a Type A RCD so they need a Type B RCD. The former being AC connected don't leak dc so are quite happy with a Type A RCD.
 
Unless you have over 7kw of plug in solar on the same ring, you can’t have an over current issue.and even then it’s unlikley because any load on the ring will help with loading and over current protection should be provided by the circuit breaker.
 
They've just done an article on this on The One Show....

Only mention from one expert about making sure your electrical system is up to scratch.... and a footnote about not available as "balcony" systems yet.


There is something safer about potentially several hundred volts DC out of reach on your roof compared with your dog peeing up against one in the garden....
 
It seems there is very little take up. The question must be asked, grid-tie and no battery, or battery and no grid-tie, which is the best?

So an extension lead with 4 sockets spread along its length used to supply items in the kitchen, where we likely use most of our power, so we use 100% of power generated by the solar panels, with no restriction as to how big the battery or array can be, no need to submit a G98, and with a power failure you're sitting pretty, or.

A grid-tie limited to 800 watt, most of which you give away, so only getting 40% of what you generate, and no UPS.

Can't see how grid-tie can win out?
 
View: https://www.youtube.com/watch?v=EFZ6hIL0uNE
This guy, although not strictly legal has followed what would be expected from a legal system, so his results are very interesting.

He says he uses about half of what he produces, which is more than I expected, but this is one of the best summers we have had.

Winter if anything the present used will increase, but the big question is what would the same panels produce if connected to a battery pack, and a radial from the battery pack fed many items in his house? With no grid tie.
 

OFFICIAL SPONSORS

OFFICIAL SPONSORS

Thread statistics

Created
EricMark,
Last reply from
EricMark,
Replies
44
Views
3,054
Back
Top