makes you laugh though when you see plumbers charging £2000 for a combi change that takes him less than a day and can pick the boiler up for less than £800.....

Which is what my father in-law recently paid. He's now paying a 2nd boiler man to fix the first install and part of the fix is to run a p/l to the boiler - which it needs!

How do these guys get away with such shoddy work and then not answer phone calls?
 
Which is what my father in-law recently paid. He's now paying a 2nd boiler man to fix the first install and part of the fix is to run a p/l to the boiler - which it needs!

How do these guys get away with such shoddy work and then not answer phone calls?

Disgusting isn't it...I bet the 1st plumber has work coming out of his ear holes as well.
 
I generally charge around £400 including any simple earthing/bonding upgrades.

With AMD3 boards you can justify a bit more in my view due to the cost of the board itself.

Yep it's true boilers keep your house toasty but we keep their boiler powered up and allow them to watch TV and ****! So don't lower your prices too much lads and lady's!
 
He must be a muppet. The new boiler is a Greenstar 24i which clearly needed a p/l as well as a s/l!

It must be a greenstar 24Ri as the 24I is a combi. yeah and if its an S-plan then it may require an automatic bypass valve to be installed for the pump over run otherwise the water will have no where to flow. Hopefully the new plumber gets it sorted...im surprised you haven't been roped in to sort the wiring as a love job lol?
 
Last edited by a moderator:
It must be a greenstar 24Ri as the 24I is a combi. yeah and if its an S-plan then it may require an automatic bypass valve to be installed for the pump over run otherwise the water will have no where to flow. Hopefully the new plumber gets it sorted...im surprised you haven't been roped in to sort the wiring as a love job lol?

It was only mentioned in passing when we visited last weekend. All I did was to check the wiring diagram of the boiler and as my father in law is doing the board lifting and the guy was booked to visit yesterday, there was nothing really for me to do...... this time.

My next visit is to "remove" the redundant meter feeding what was the "granny" flat as the powerline adaptors don't like working in the extension - so this is my next freebie for them!
 
Trouble is, they can wander through B&Q and see a lovely CU for £60!

Edit; £40 now

Way I see it, my price is my price, if they want it cheaper then they're advised to go elsewhere rather than try and barter with me because it's fixed. Some people will always go for the cheapest quote though, then complain about the standard of work or lack of certification.
 
I used to charge roughly £300 for a pre-ammendment 3 CU replacement. I think I'll charge a minimum of £350 post Amd 3, this is assuming no complications/additional work such as bonding/earthing etc. This is for approx 1 days work plus an hour in the evening writing up the certificate and notifying.

I'm in gloucestershire.
 
Last edited:
Way I see it, my price is my price, if they want it cheaper then they're advised to go elsewhere rather than try and barter with me because it's fixed. Some people will always go for the cheapest quote though, then complain about the standard of work or lack of certification.
Quite agree with you. But some of my 'non-customers' don't. Seen quite a few CU's that could do with replacing, and I get 'How much, I can get one from BQ for £x', rock on I say. Just wished these stores weren't allowed to sell CU's. But that's another moan!
 
Quite agree with you. But some of my 'non-customers' don't. Seen quite a few CU's that could do with replacing, and I get 'How much, I can get one from BQ for £x', rock on I say. Just wished these stores weren't allowed to sell CU's. But that's another moan!

I always quote a straight price and never break it down to each component or as parts and labour. The only clue they get to pricing is when they ask for several quotes (for various amounts).
 

OFFICIAL SPONSORS

Back
Top