- Oct 28, 2021
- 3
- 0
- 31
- If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
- United Kingdom
- What type of forum member are you?
- Practising Electrician (Qualified - Domestic or Commercial etc)
- If other, please explain
- No
- Business Name
- Alltrades
Hi
We have just won a job to provide eicrs to a group of new build properties owned by a local housing association. (5 years old)
Each property is fitted with solis mini 1500 4g invertor in the loft for the pv installation.
Every single property appears to have a split load board. Hager Type A rcds and a 16amp mcb supplying the invertor.
Does anyone have an opinion on which code should be used here?
It's not a high integrity board, meaning no spare way to move the pv circuit.
We have just won a job to provide eicrs to a group of new build properties owned by a local housing association. (5 years old)
Each property is fitted with solis mini 1500 4g invertor in the loft for the pv installation.
Every single property appears to have a split load board. Hager Type A rcds and a 16amp mcb supplying the invertor.
Does anyone have an opinion on which code should be used here?
It's not a high integrity board, meaning no spare way to move the pv circuit.