Had to install this meter cupboard in a 8 hours, i moved all loads from existing cupboard(now demolished) to new cupboard 20m away and had to re connect everything. It fed a sewage station and a aquaduct so time was precious. Could have been spot on if i had more time but needs must ey.
I'm just bumping some threads in the Electrical Forum, don't mind me while I do this, you don't have to respond to them. Although if they are still current topics, and you do wish to reply, you're welcome to. Keep the thread on-topic and make sure you stick to the forum rules though.