O
overskilled
So for the last 3 weeks I've been having intermittent flickering lights etc - went over the entire house electrics with a fine tooth comb, had another spark out to double check, he concurred that it was definetely a DNO supply problem. Call them out...because the power is still on (albeit lights flickering like a dervish) they decided to monitor the voltage.
cue this today - DNO pick up the voltage recorder and not 90 minutes later...the power goes out.
They send out an engineer (unlike most of his colleagues locally....a snotty little jobsworth...looked at the switchfuse I was in the middle of installing when the power went out and started a line of questioning and hinting that I was nicking electric....tw*nt...told him I was going to replace the tails on my side (meter had been left unsealed by a previous guy so I could paper seal it later....his response.....slap new wire seals on as "you shouldn't be touching that"....clearly unaware of his own company's policies regarding reseals by competent persons...right little hitler) and decided that a dig crew would have to come out (no crap..state the flipping obvious)
phoned connections regarding getting their tails from cutout to meter upgraded from 10mm2 to 16 or 25 and asked if they could do it while repairing the supply cable....guy reckoned it shouldn't be a problem and phoned the depot to check..depot reply ."have to raise a separate chargeable job for that...." bloody profiteering at its worst (especially as I've been told the tails will be done when the meter is changed next year...so why not just do it there and then...the whole 4 to 6 inches of tails....)
they want for a supply fuse upgrade and a supplier side tails upgrade: a site plan, a street plan, photographs of site etc etc etc (the cable is already there...I don't want a new supply....)
So my response is going to be sending them an invoice for the cost of repairing the switches that got torched when the supply voltage hit the deck (fridge compressor took out its isolator...) not that they will pay up of course without a fight.....
bloody dnos.....red tape everywhere and to cap it off...I have no alcohol in the house to drown my sorrows.....
</rant>
cue this today - DNO pick up the voltage recorder and not 90 minutes later...the power goes out.
They send out an engineer (unlike most of his colleagues locally....a snotty little jobsworth...looked at the switchfuse I was in the middle of installing when the power went out and started a line of questioning and hinting that I was nicking electric....tw*nt...told him I was going to replace the tails on my side (meter had been left unsealed by a previous guy so I could paper seal it later....his response.....slap new wire seals on as "you shouldn't be touching that"....clearly unaware of his own company's policies regarding reseals by competent persons...right little hitler) and decided that a dig crew would have to come out (no crap..state the flipping obvious)
phoned connections regarding getting their tails from cutout to meter upgraded from 10mm2 to 16 or 25 and asked if they could do it while repairing the supply cable....guy reckoned it shouldn't be a problem and phoned the depot to check..depot reply ."have to raise a separate chargeable job for that...." bloody profiteering at its worst (especially as I've been told the tails will be done when the meter is changed next year...so why not just do it there and then...the whole 4 to 6 inches of tails....)
they want for a supply fuse upgrade and a supplier side tails upgrade: a site plan, a street plan, photographs of site etc etc etc (the cable is already there...I don't want a new supply....)
So my response is going to be sending them an invoice for the cost of repairing the switches that got torched when the supply voltage hit the deck (fridge compressor took out its isolator...) not that they will pay up of course without a fight.....
bloody dnos.....red tape everywhere and to cap it off...I have no alcohol in the house to drown my sorrows.....
</rant>