So for the last 3 weeks I've been having intermittent flickering lights etc - went over the entire house electrics with a fine tooth comb, had another spark out to double check, he concurred that it was definetely a DNO supply problem. Call them out...because the power is still on (albeit lights flickering like a dervish) they decided to monitor the voltage.
cue this today - DNO pick up the voltage recorder and not 90 minutes later...the power goes out.
They send out an engineer (unlike most of his colleagues locally....a snotty little jobsworth...looked at the switchfuse I was in the middle of installing when the power went out and started a line of questioning and hinting that I was nicking electric....tw*nt...told him I was going to replace the tails on my side (meter had been left unsealed by a previous guy so I could paper seal it later....his response.....slap new wire seals on as "you shouldn't be touching that"....clearly unaware of his own company's policies regarding reseals by competent persons...right little hitler) and decided that a dig crew would have to come out (no crap..state the flipping obvious)
phoned connections regarding getting their tails from cutout to meter upgraded from 10mm2 to 16 or 25 and asked if they could do it while repairing the supply cable....guy reckoned it shouldn't be a problem and phoned the depot to check..depot reply ."have to raise a separate chargeable job for that...." bloody profiteering at its worst (especially as I've been told the tails will be done when the meter is changed next year...so why not just do it there and then...the whole 4 to 6 inches of tails....)
they want for a supply fuse upgrade and a supplier side tails upgrade: a site plan, a street plan, photographs of site etc etc etc (the cable is already there...I don't want a new supply....)

So my response is going to be sending them an invoice for the cost of repairing the switches that got torched when the supply voltage hit the deck (fridge compressor took out its isolator...) not that they will pay up of course without a fight.....

bloody dnos.....red tape everywhere and to cap it off...I have no alcohol in the house to drown my sorrows.....

</rant>
 
You should of connected the in your words little hitler across the mains.

Cannot stand people who think they're above everyone...and especially when they do it to your face.

You do right on the invoice. Do you feel better now you've ranted to us on here? That's the real question.....
 
Don't forget the damage to you 50" led TV with the voltage spikes created by the issue and the boiler circuit board oh.. and self invoiced repair bills you did.. that should cover all their extortionate costs.
 
And the fact that the little hitler made sexual advances on you - that you obviouslly politley rejected. Thats on top of everything professional you said to him was getting translated into sexual innuendos.

That'll teach the little know it all.
 
darkwood:
Surprised the boiler didn't break down....useless thing would any other time.....already tried to kill me through a leaking gas valve earlier this year....that was "fun" when I discovered the boiler cupboard was stinking of gas and the boiler had been firing all morning.....needless to say the service company got a mouthful after their guy gave the wife a heart attack almost by telling her it "could have exploded at any moment" this is after 3 of their guys pronounced it safe in as many weeks, (wife swore she was smelling gas before that, I couldn't smell it though, but got the service guys out...one of whom told me it was the condensate pump tank water going stagnant or the insulation on the hot water tank getting warm...)

Mark:
I did consider that...shame I had no electrical supply...and digging up the pavement to connect him to the street cabling seemed like too much effort at the time.

Upshot:
Had a go with their emergency number..."normally" I'd be told to claim on house insurance BUT in this case they will send it through to complaints, and see what they can come up with....and an agreement that the depot should have used some discretion and common sense in terms of upgrading supplier side tails, as crew on site anyway and tails would be upgraded within the next 12-24 months FOC during meter swap so why not do it there and then.
Told the callcentre I would accept a hefty discount on a cutout upgrade as compensation....see what complaints come up with tomorrow...

Reason for wanting a cutout fuse upgrade: I'm putting up a garage with a 160-200amp welder in it...32A supply it needs alone, so methinks a 60Amp cutout fuse isn't going to take kindly to a houseload (washer, dryer, large electric cooker, vacuum cleaner, lights etc) going at the same time as the welder....and one of their engineers previously agreed on that point and reckoned 80amp minimum to make sure it wouldn't pop...Yet according to connections, 80 is no longer offered and the 2 options are 60 and 100amps...which in theory might mean changing the cutout as the current one is marked 60/80amps.

On a side note...why do the DNO get away with burying non armoured concentric cable without mechanical protection?

Seemingly according to the jointing crew, it isn't difficult to sever the neutral, stoney ground has been known to do it in the past....
 
Mark:
Yeah I feel a bit better mate, replies also helped lighten the mood...as did giving the DNO crap on the phone...vented a bit of frustration....

Still tomorrow should be better...nice little sub con job, blown fluoro tubes and other bulbs in a retail unit...only slight downside is the prime contractor's supplier is CEF (for anything I need for the job not on site and in this case...nothing is on site as the retail unit have phoned in to say "some of the lights have stopped working" so first job is to find out how many "some" is..).CEF being my.... *favourite* people to deal with...last time I did a similar sub con job, the prime contractor sent me the items needed from their stock as CEF "couldn't find their account on our system" despite the prime contractor having a national account with CEF...seems that wasn't the first time it had happened and they weren't expecting it to be the last...lol...
 
Last edited by a moderator:
Cue one phone call from CS at SSE PD this morning...waffle...lost the plot a bit...told them I wanted words with their management and an answer as to what they were planning to do as compensation as "looking into the situation" is wasting my time well and truly....(I laid it on thick.....including comments about "blatant profiteering", "damned arrogance and sheer rudeness", "only pulling your fingers out of a certain orifice once the power had went out, rather than dealing with it when you were aware that something was wrong", "wasting my time going over the internal wiring when you were fully aware the problem was on your side" "laying cables that your staff have admitted can be easily damaged and failing to lay cable with suitable mechanical protections to avoid supply outages"...waffle tends to incite a nuclear level response...my BS-o-meter goes into the red zone at the first sniff of it....)
Result...phone call back from said CS person...my manager has authorised a goodwill cheque (healthy enough figure and probably as they were afraid I'd escalate it to levels that might take an unhealthy interest into what goes on at the ground level) which I was willing to accept
 