Can I use 16mm tails for a sub DB supplying a solar board? The service fuse is currently 100A, and there’s very limited space in the meter box to accommodate Henley blocks, a 100A main switch, and 25mm tails.would it be possible to reduce the service fuse size to 80A?
 
One circuit loaded at 1.5KW how is it going to achieve 100A on the tails?
 