Recently quoted on a big job at a factory...

New SWA etc... Tray,Lighting,CCTV blah blah blah....

any way i also set ball in motion for upgrade of Main Supply Cables from DNO... currently 3P 60kva.... Needed 100kva to give decent capacity...

lets just say i got copied into a email from NEDL to Customer (i never won job by the way) as my details were on original New Connections paperwork.


(chopped down as very long...)
Dear xxxxxxx,

We recently had correspondence from an electrical contracor to upgrade supply and we requested DOL/AMP/KVA requirements etc...

unfortunately we never received them and were unable to carry out the quote.

blah blah blah... etc

(couple of paragraphs down)

Please find attached invoice for Emergency Maintenance works to the above named supply address due to damaged supply cable etc....

£17590.49+vat

a reconnection charge of £1599.00+vat


cut to the chase on this email but the company using idiot sparks on a cheaper job (apparently) managed to MELT and destroy 1 3 phase service head , 1 underground Joint, 45 meters of ducted cable and the business park was plunged into darkness when ALL 3 Sub station fuses went POP!!! (after cable was already damaged... )

GOD Knows how but they did it!!


i have not stopped laughing
 
Last edited by a moderator:
I wonder how much the total cost is, as I am sure there may well be other businesses that will want to recoup some down time costs, that guy will get reamed by his insurance company (if he is insured)!
 
heartwarming story that mate, I love hearing stuff like this.

Lesson no. 1 - cheaper quote is not always cheaper job.
 
Well although we're playing a game of assumption here it could have been anybody else working on site from labourers builders etc i can only assume the cable has been hit with a digger to have damaged a joint and because it was ducted it could have easily ripped itself from the service head, this is more than likely to be a better explanation than the sparkies did it..... even if you threw an axe through the service head it shouldnt take out a properly terminated underground joint and if it did i would argue the costing to repair this as it wasn't able to withstand a fault current.
Having a little re-read on the OP its said the cable and service head melted and this senerio would only happen if the service fuses were unofficially upgraded and current demand then exceeded service head rating and cable rating to the joint, now that would be naughty!!!!!
 