i get the bit about unbalanced three phase and the self adjusting voltage bit with the floating neutral. I just can't think immediately of a situation where it would be significantly detrimental to have all three phases and the neutral disconnect at an EXACT same time. There are perhaps numerous commercial/industrial applications where this can have an adverse affect but this is not my line of work really. As I tend to steer clear of commercial/industrial and I rarely have any dealings with three phase domestically (self restricted knowledge of three phase systems). I have previously turned domestic three phase jobs down by pricing myself too high. One day someone will call my bluff then I'm stuffed. ;)

I'll find the drawing.
 
recently had a 3-phase supply installed for a block of 5 flats plus landlords, paperwork came through asking for the sparky to install all tails from head through to a 100 amp isolator, then on to a ryfield board, on to the meters and then on to the individual sub-main switch fuses.
They turned up to cut off the old supply and install the new supply and asked when the first of the metering companies were turning up to install / reconnect the meters, we were asked as sparks to be in attendance to provide and install the tails etc only, anyway, nobody had asked for the meter men to attend so the day was aborted.
All arranged for 2 weeks later with all the meter men to turn up pm
power was disconnected, i asked where exactly they wanted the isolator, what do you want one of them for was the guys answer, that saved me a few quid.
All connected up without the isolator and waited for the meter men, all 4 companies turned up and couldn't understand why the fuses hadn't just been put back in.
The biggest laugh though was the man from eon when he came to connect the new build flat sub-main, he struggled to speak english, he asked if we used red or blue as live so we said brown, then after his connection he wanted to do a polarity test which we suggested he could do at the sub-main switch fuse but he wanted to go to the flat, so we took the front off of the consumer unit and he then wanted to borrow a plugin tester to test a socket for polarity. He then buggered off in a beaten up nissan micra.




he he he classic
 
Here you go
The blue line represents an inverse of the current. So the shorter the line the more current is been drawn on the phase it's at right angles to.
Vectorbalance2_zps1f0b1d2b.jpg
 
Here you go
The blue line represents an inverse of the current. So the shorter the line the more current is been drawn on the phase it's at right angles to.
Vectorbalance2_zps1f0b1d2b.jpg
Thanks Tony.
this is the sort of stuff I must have covered nearly 20 years ago but since I never completed my apprenticeship I never kept any of my study stuff. Am I right in saying that the Red phase having a lower voltage would have an increased current and therefore present problems to the circuits on that phase, although protected by their over current devices? I keep picking more up but layman's terms is the best way for me ;)
Cheers
 
Here you go
The blue line represents an inverse of the current. So the shorter the line the more current is been drawn on the phase it's at right angles to.
Vectorbalance2_zps1f0b1d2b.jpg

Staring at that is quite .. hypnotic.

I almost slid off me chair.
 
the DNO will want 1 switch fused isolator to isolate the whole supply so what you where going to do in your first post was correct in my experience with them and what tel says makes sense but they wont give a ---- if it causes an inconvenience
 
Thanks iamelectric! So if they do want that, I could put a 4 pole isolator in then each phase could feed a switch fuse for each of the 3 properties, and put a Henley block in for the neutrals after the isolator to take a neutral to each switch fuse?
 
You really need to confirm what is actually going to be needed for this multi occupancy building before you start purchasing materials.... eg. make sure there is no requirement for a landlords supply for the common areas etc!! It may be better to then go for a Ryefield board rather than individual switch fuses. You would then need a TP&N isolator after the service head into the meters then into the Ryefield board and away to the individual apartment CU's (and Landlords common area CU)
 
There was an episode in Nottingham where a three core concentric had its outer serving damaged by the water board. There was no bang so they just filled the hole in.
Over time the PEN rotted away leaving a floating neutral. The then EMEB had to pay out a fortune for the televisions and VCR’s in the entire street. Of course the good honest people of Nottingham didn’t take advantage of it. The EMEB were fleeced.
 
the DNO will want 1 switch fused isolator to isolate the whole supply so what you where going to do in your first post was correct in my experience with them and what tel says makes sense but they wont give a ---- if it causes an inconvenience


Switch fuse is NOT what he said in his opening post.


Boydy
 
Thanks engineer54, may not have explained my self well, the site is basically a plot of land, which is getting 2 houses and a workshop built on it, so 3 totally separate installAtions, no common areas etc. from what has been described to me is a brick shed / cupboard has been built and passed by the dno to house their new 3 phase supply, a phase per property! Hope that makes it a bit more clear, as said never had dealings with dno with regard to this type of job before, this is why I wanted a bit of advice / guidance from more experienced sparks!
 