Yes at the minute there is a brick built cupboard to which the supply is being put to, this is where the isolation points for each of the 3 buildings will be. Buildings not erected yet but plans signed off. Again I am yet to see this, as I have only been described this over a phone call! I believe 2 will be dwellings and the other a workshop!

is there a requirement for the switch fuses to be double pole?


As far as the switch side of the Switch Fuse YES!! But then they all come as standard in that arrangement!!
 
re workshop.....3phase reqd? Where has the proposed intake position been sited? Or is it already existing. From what I've read, the mains / meter position must be accessible by ALL parties 24/7 i.e. sited in a communal area. As mentioned above Landlords supply reqd and possible fire alarm also.
 
I wonder how many understand why.....

Ok I'll pop me hand up sir. ;) I would think you are referring to the neutral being in contact first when the switch is closed as it makes sense not to have live conductors without the neutral (yep I know the neutral is live too) attached. And the neutral is the last contact to be broken when the switch is opened for the same reason. So in both cases the neutral is always connected when the 3 phases are connected.
I don't mind asking the questions as sometimes glaringly obvious things don't always stand out. And I am sure there are other perfectly good and probably better reasons in addition but would appreciate if somebody could elaborate more and offer as much advice as possible because this is one long learning curve that keeps getting steeper n my slippers feel like banana skins.
Cheers fellas
 
Ok I'll pop me hand up sir. ;) I would think you are referring to the neutral being in contact first when the switch is closed as it makes sense not to have live conductors without the neutral (yep I know the neutral is live too) attached. And the neutral is the last contact to be broken when the switch is opened for the same reason. So in both cases the neutral is always connected when the 3 phases are connected.
I don't mind asking the questions as sometimes glaringly obvious things don't always stand out. And I am sure there are other perfectly good and probably better reasons in addition but would appreciate if somebody could elaborate more and offer as much advice as possible because this is one long learning curve that keeps getting steeper n my slippers feel like banana skins.
Cheers fellas
does it...

so, tell me...is the neutral a live conductor?
 
Last edited by a moderator:
does it...

so, tell me...is the neutral a live condustor?

ooh eck, GULP ;)
does it? I would assume having the neutral connected whilst the 'Line' conductors are connected is a must. As an alternative suggestion I wouldn't turn the tap on to my sink if I hadn't fitted the waste pipe or popped a plug in, or I wouldn't take the waste pipe off without draining the sink.
Is the neutral a live conductor? Line and Neutral now referred to as Live conductors as opposed to Live and Neutral.

Can an I just add that this forum is by far the most valuable commodity anybody in this trade can have, whether we are at apprentice level or almost time served as I am sure we have all overlooked or made mistakes at some point or other and it's places like this that will help us to reduce the chances of making those mistakes. I for one would much rather get things a tad mixed up on here than fatally wrong elsewhere which is why I still only take on little jobs.

GLENNSPARK have my banana slippers turned to highly greased skis?
 
ooh eck, GULP ;)
does it? I would assume having the neutral connected whilst the 'Line' conductors are connected is a must. As an alternative suggestion I wouldn't turn the tap on to my sink if I hadn't fitted the waste pipe or popped a plug in, or I wouldn't take the waste pipe off without draining the sink.
Is the neutral a live conductor? Line and Neutral now referred to as Live conductors as opposed to Live and Neutral.

Can an I just add that this forum is by far the most valuable commodity anybody in this trade can have, whether we are at apprentice level or almost time served as I am sure we have all overlooked or made mistakes at some point or other and it's places like this that will help us to reduce the chances of making those mistakes. I for one would much rather get things a tad mixed up on here than fatally wrong elsewhere which is why I still only take on little jobs.

GLENNSPARK have my banana slippers turned to highly greased skis?
nah...your allrite...
 
does it...

so, tell me...is the neutral a live condustor?

GLENNSPARK I'm not being daft when I mentioned the sink it's just that sometimes I struggle to explain things in the right context. I might change my profile name to 'bucket memory' cos every time I remember something new an old memory spills out again. ;)
 
GLENNSPARK I'm not being daft when I mentioned the sink it's just that sometimes I struggle to explain things in the right context. I might change my profile name to 'bucket memory' cos every time I remember something new an old memory spills out again. ;)
your allrite..

i`m not having a go...

not today...

enjoy the forum...
 
According to the waffle from the IET it is. That makes no odds, the fact still remains it should make first, break last.

As an experiment Glenn, disconnect the neutral on an unbalanced system. (You pay for the damage!) You’ve got the drawing of voltage vectors in relation to current on a floating neutral on that data stick.
 
According to the waffle from the IET it is. That makes no odds, the fact still remains it should make first, break last.

As an experiment Glenn, disconnect the neutral on an unbalanced system. (You pay for the damage!) You’ve got the drawing of voltage vectors in relation to current on a floating neutral on that data stick.
thank you Tony...but i sent the Data stick this morning back to you...

should arrive in a few days...:biggrin:
 
Think unbalanced three phase with loss of Neutral
i get the bit about unbalanced three phase and the self adjusting voltage bit with the floating neutral. I just can't think immediately of a situation where it would be significantly detrimental to have all three phases and the neutral disconnect at an EXACT same time. There are perhaps numerous commercial/industrial applications where this can have an adverse affect but this is not my line of work really. As I tend to steer clear of commercial/industrial and I rarely have any dealings with three phase domestically (self restricted knowledge of three phase systems). I have previously turned domestic three phase jobs down by pricing myself too high. One day someone will call my bluff then I'm stuffed. ;)
 
Recently had a 3-phase supply installed for a block of 5 flats plus landlords, paperwork came through asking for the sparky to install all tails from head through to a 100 amp isolator, then on to a Ryfield board, on to the meters and then on to the individual sub-main switch fuses.
they turned up to cut off the old supply and install the new supply and asked when the first of the metering companies were turning up to install / reconnect the meters, we were asked as sparks to be in attendance to provide and install the tails etc only, anyway, nobody had asked for the meter men to attend so the day was aborted.
all arranged for 2 weeks later with all the meter men to turn up pm
Power was disconnected, I asked where exactly they wanted the isolator, what do you want one of them for was the guys answer, that saved me a few quid.
all connected up without the isolator and waited for the meter men, all 4 companies turned up and couldn't understand why the fuses hadn't just been put back in.
the biggest laugh though was the man from eon when he came to connect the new build flat sub-main, he struggled to speak English, he asked if we used red or blue as live so we said brown, then after his connection he wanted to do a polarity test which we suggested he could do at the sub-main switch fuse but he wanted to go to the flat, so we took the front off of the consumer unit and he then wanted to borrow a plugin tester to test a socket for polarity. he then buggered off in a beaten up Nissan micra.
 

OFFICIAL SPONSORS

Back
Top