Well chaps, today was the first day of tidying up this little lot.

Loads of Wylex rewireables, big green enclosure is the contactor to shut off all the sockets via switch on the way out of the workshop.

Dis assembled the cupboard as the new DB wouldnt fit:D

8am start:(

Image000.jpg


Then remove the first cu, contactor.

Took ages to number up all the circuits.

Image003.jpg


Then, had to get on and fabricate a ply backer board on battens and standoffs, as the wall was horrendous and the new DB went down past the incomer which comes across the wall.

Hager 16 3ph way DB with extension box along the base which houses main switch, new 4 pole contactor which feeds 3 rcbos for workshop rfc. Digital timer with memory key (not sure how that works yet) that feeds 3 more rcbos for window display lights, and at the end, 63Amp RCD that is a submain to an existing CU in an upstairs office that does part of the showroom.

Image004.jpg


Not really many 'in progress' pics but you get the idea.

Next weekend, hopefully finish off then its back to do all the labeling and schedules and a bit of a tidy up etc..

Ill keep ya posted!
 