First of all, hello :waving:and thank you in advance for any help in the following.
I was checking my meter reading and I noticed some black tar type stuff had leaked from the main cable by the main fuse inlet. Also the back board that its fixed to was crumbling (old chipboard) so I fixed a batten behind the board and bolted it to the wall. I called my supplier and they are sending (TWO) engineers to fix the problem. One for the main fuse and one for the backboard?
I told them that they sit next to each other and can be done at the same time…..think I started a union war, fuse-man not allowed to do carpentry work!!! Anyway the fuse-man is coming on Friday.
Now back in the early eighties I fitted two RCD boxes (a seven and eleven) with a split tail box plus a separate trip switch. I have each room going to its own fuse. The outside electrics to my log cabin (35 mm) was done by a sparky, this has its own RCD for power and security lights.
Do you think this tar leak is through age or have I inadvertently overloaded somewhere along the line. I also upgraded the earth wire to six mm which is connected to the main incoming cable. I am unable to post a photograph because I am a new member.
 
If the "tar" is soft then it's ressent and could be an overload, but not likelly. Old an brittle, a spill from when it was installed.?
 
thanks, this is clean and recent, it has run over the new earth bracket fitted about six months ago. It is hard to the touch.
 
First of all, hello :waving:and thank you in advance for any help in the following.
I was checking my meter reading and I noticed some black tar type stuff had leaked from the main cable by the main fuse inlet. Also the back board that its fixed to was crumbling (old chipboard) so I fixed a batten behind the board and bolted it to the wall. I called my supplier and they are sending (TWO) engineers to fix the problem. One for the main fuse and one for the backboard?
I told them that they sit next to each other and can be done at the same time…..think I started a union war, fuse-man not allowed to do carpentry work!!! Anyway the fuse-man is coming on Friday.
Now back in the early eighties I fitted two RCD boxes (a seven and eleven) with a split tail box plus a separate trip switch. I have each room going to its own fuse. The outside electrics to my log cabin (35 mm) was done by a sparky, this has its own RCD for power and security lights.
Do you think this tar leak is through age or have I inadvertently overloaded somewhere along the line. I also upgraded the earth wire to six mm which is connected to the main incoming cable. I am unable to post a photograph because I am a new member.

If the capacity of the cable Is sufficient for the maximum load of the circuit it should not be a problem. The Tar/Bitumen melts at about 231oC, but like many of the road repairs you may see it can go soft with ambient temps being high, this causes it to swell and may mean it will push out of the end, as it has no where else to go. Not necessary to panic about the bitumen. Check you current at ful load if you can. If it is within the calculated capacity it should be ok. Barring any faulty equipment on the system.

Paul C
 
maybye the cartridge fuse in the c/o is only a 60a and is getting a bit hot under max load thus melting the bitumen
if they look they will probably remedy the prob
the earthing cable is too small btw
 
Thanks guys, the earth cables (2) one from each box...errrm I put the earth cables to the existing clamp but added a longer bolt. What size should it be? don't think anything bigger would fit inside the box. It only had a small wire before about 2.5. No tests have been carried out, it will be interesting to see what the engineer thinks. Is there a rule that you can't touch their side of things like the telephone cables?
 
On the basis that you are not an electrician.......the size of main earth you require will depend upon the type of earthing facility supplied by the DNO. You will also require main protective bonding conductors to any incoming gas, water etc which is via metal pipework. Too many folks think "it's just an earth wire", but the connection from the supplier's earthing facility to your consumer units is very important (even though you appear to have RCD protection on your boards).

I know it's a well worn mantra on this site, but you should get a qualified spark to check the Ze and the Zs of connected circuits for you - it won't cost the earth.
And don't expect the DNO engineers to comment on your installation!

Regards.
 
Thanks for that polo, I have bonding clips that I obtained from a DIY store fitted to all copper pipes in airing cupboard, the gas pipe and the hot/cold water pipes in the garage. I have not taken a feed back to the consumer box, this is my next job. The gas and water main is plastic and I thought it pointless putting a clip on these.
I have one bit of the re-wire left to do and I am going to engage a sparky for this because it is the bathroom and kitchen lighting circuit.
At the moment the lights drop down from junction boxes and the earth wires are (bare stranded wires) and twisted together out side the J-box. I suppose that was the legal way of doing things when my bungalow was built in 1960.
 