yes i thinkso, his tails for this little rcd unit for the shower are not connected into the CU at all, they are into the bit where the main tails come in! so this isnt correct now??

What are the the odds that the main fuse is 60A!!!! ;)
The best way under your current setup would be to take a 6 or 10mm feed from a 40A fuse/MCB in the main Cu to the shower units, thats assumiong you had 2 spare ways. The main problem here is I'm assuming your main CU is full which is why this hasn't been done, and 2 electric showers plus your existing circuits will be probably more than your main fuse is rated at, however there is a wonderful thing known as diversity and the chance of all the circuits being full load at the same time aren't good so the fuse probably won't blow, this doesn't make it right though.
I know I'm sounding like a broken record but a new CU is the way to go. Not sure if its an old rewirable wylex CU you have but if it is then they need replacing anyway they should be illegal now!!
 
Quote:
Originally Posted by Moog
Are you saying he has the new shower connected before the CU? If this is the case and your whole installation exceeds the rating on the suppliers protection device then you will be paying out each time the suppliers fuse blows around £50 a time


yes i thinkso, his tails for this little rcd unit for the shower are not connected into the CU at all, they are into the bit where the main tails come in! so this isnt correct now??

dont worry this post by moog is a little misleading
the overall load on the suppliers fuse is the same no matter how or where the shower is connected
as said by most a new cu is ideal but what he is doing seems ok
 
Quote:
Originally Posted by Moog
Are you saying he has the new shower connected before the CU? If this is the case and your whole installation exceeds the rating on the suppliers protection device then you will be paying out each time the suppliers fuse blows around £50 a time


yes i thinkso, his tails for this little rcd unit for the shower are not connected into the CU at all, they are into the bit where the main tails come in! so this isnt correct now??

dont worry this post by moog is a little misleading
the overall load on the suppliers fuse is the same no matter how or where the shower is connected
as said by most a new cu is ideal but what he is doing seems ok

ok thats great, ill try get some pics tomorrow though and post them up tomorrow night!:)
 