I'm completing a job started by another electrician (oh the joy) and the client has all the ordered materials on site as the previous guy instructed them.
One thing I have to do is re route the armored cable between two CU's in a large outbuilding as it presently runs where they are planning to fit an emergency exit, I did a very similar job for another client in an adjacent building and used 3 core armored and only earthed the sheath at one end, now this client has only been instructed to buy 2 core as I'm assuming the previous guy was going to use the sheathing as a CPC, not sure if I'm 100% comfortable with this, any thoughts would be appreciated.
One thing I have to do is re route the armored cable between two CU's in a large outbuilding as it presently runs where they are planning to fit an emergency exit, I did a very similar job for another client in an adjacent building and used 3 core armored and only earthed the sheath at one end, now this client has only been instructed to buy 2 core as I'm assuming the previous guy was going to use the sheathing as a CPC, not sure if I'm 100% comfortable with this, any thoughts would be appreciated.