what a day!!

A

adamh

what started out as a simple addition to the upstairs ring main. split the ring found that it wasnt a ring as far as the live was concerned opened up the board to find that nothing was!! :O 1 side of downstairs ring in a b32 otherside in a different b32 smaewith the kitchen except other leg was in a b16 with the shed upstairs ring just 1 2.5 in a b32 what a shambles! board was only changed 4 years ago 2 a 10way proteus (no rcd) managed to get thing straight apart from leaving the upstairs power off before home time and customer is going for a shiny new dual rcd board but it just goes to show the state of some of the workmanship that was out there was like opening pandoras box!! got a picture of a right beauty of a jb as well
 
no upstairs power:eek: call yourself a spark !
never mind he can always run an extension upstairs ;)
wish there was a way of stoppin cowboys like the previous "installer".......part p? notification?
 
what could i do 1 leg missing and didnt have enough time to find it cos its not in the board!! and no was a friend of a friend who fitted it ive got 7 lighting circuits to deal with as well and its only a 3 bed semi! whats the maximum length for tails from the meter to the cu btw??
 
Last edited by a moderator:
i think the guy must of just strolled into citys and just said ill have 1 of those the guy behind the counters said what breakers do you want and hes just said "oh you know the usual" lol
 
i know! got a bargain today tho from a wholesaler 4 ip56 chrome shower lights 4x50w gu10's single blank plate single surface b/box 2gang 2w s/w s/w fs 20.17inclusive
 
Last edited by a moderator:
It's odd what happens sometimes. 100 yard from us they knocked down a bungalow to build a block of flats. How they managed to put 5 flats in that tiny space beats me! Anyway, as they let the flats to the local authority we are involved. done several change of occupancy PIR's on them, and reported back that there is no RCD on the ground floor flats despite being new build. I watched the build as I took the kids to school! Wonder if we keep failing them, they will let us put in a new CU??
 
It's odd what happens sometimes. 100 yard from us they knocked down a bungalow to build a block of flats. How they managed to put 5 flats in that tiny space beats me! Anyway, as they let the flats to the local authority we are involved. done several change of occupancy PIR's on them, and reported back that there is no RCD on the ground floor flats despite being new build. I watched the build as I took the kids to school! Wonder if we keep failing them, they will let us put in a new CU??

??

presuming it was done to the 16th, why has RCD on the ground floor flats got you reporting it? What code did you give it, and what reg has it contravened?:rolleyes:

no upstairs power:eek: call yourself a spark !
never mind he can always run an extension upstairs ;)
wish there was a way of stoppin cowboys like the previous "installer".......part p? notification?

Wayne, if it was 4 years ago, it would have been before Part P
 
Last edited by a moderator:

OFFICIAL SPONSORS

Back
Top