M
mstoker1990
Been to a right job today, alot of work needed to bring it up to spec.
A few questions im unsure with and its alot easier to ask on here than go through the regs.
The Use of RCD's is it a requirement on 16A Socket outlets in an area used for cutting meat?
are lights required to be RCD protected in an area where meat is cut? also these areas are pressure washed.
Also this place has two heating boilers.
Three supplies feed this lot, one feeds both boilers, one feeds the pump, one feeds the controls. Is this allowed or has it all got to pass through one isolator first? as if you turn the boiler isolator off potentially you still have live wires at the boiler from the controls feed, they are all fairly close together, but not right together.
Also two seperate supplies feed the same building, so how do you go about structural steel?
The poor fella thought everything was up to spec turns out to need alot of attention, if someone can help me out with those few questions it be great.
Cheers guys
Mark
A few questions im unsure with and its alot easier to ask on here than go through the regs.
The Use of RCD's is it a requirement on 16A Socket outlets in an area used for cutting meat?
are lights required to be RCD protected in an area where meat is cut? also these areas are pressure washed.
Also this place has two heating boilers.
Three supplies feed this lot, one feeds both boilers, one feeds the pump, one feeds the controls. Is this allowed or has it all got to pass through one isolator first? as if you turn the boiler isolator off potentially you still have live wires at the boiler from the controls feed, they are all fairly close together, but not right together.
Also two seperate supplies feed the same building, so how do you go about structural steel?
The poor fella thought everything was up to spec turns out to need alot of attention, if someone can help me out with those few questions it be great.
Cheers guys
Mark