T

TPES

Conservatory, 2 double sockets, 2 wall lights. Will be left bare brick all round, No plastering at all. Theres no existing power directly backing on to where conservatory will go. The easiest way i can see to get power there is from a dining room Double socket, its less than 2 meters down the side of the house from the garden (start of conservatory), The CU is on the opposite side of the house in the kitchen on an internal wall.. So very difficult to feed directly from CU..

A rough idea on what you'd charge labour to do 1st, 2nd fix and issue a cert? I know its very hard to price without seeing.
 
£55 a point I do them all the time, on average about 3hrs to 1st fix and a couple to 2nd fix and test 5hrs work £40 per hr plus a score for materials.
 
i take it they dont mind having the walls in the room behind coservatory chased :confused:

are the sockets going on what would have been the outer wall of the house or the outer wall of new conservatory :confused:
 
i take it they dont mind having the walls in the room behind coservatory chased :confused:

are the sockets going on what would have been the outer wall of the house or the outer wall of new conservatory :confused:

Cant chase any rooms inside the house, No mess inside the house at all can be made, they wont pay for any chases or replastering.

There will be one socket on the outer wall of the house and one on the outer new wall of conservatory. Not surface mounted either, Back boxes will be sunk into the brick.. I think the builder will sit the back boxes in the wall as he bricks it up.
 
Sid
If

Sid, if they wont accept chases inside,then as yo say run it outside (in conduit if you must),once your into the new conservatory area the builder will build in your boxes,make sure he keeps the boxes tight to the upper course and builds the pug up under the box that way when you 2nd fix tou dont get gaps between the top of the socket and the brick line. The spur for the lights the light switch etc can be built in as he goes along if the lights and switch are on the existing wall remove a brick directly in line with the switch and light positions but at screed level fish the cables up and get the brickie to replace the bricks you remove. When the screed goes down and the skirtings go on therei s nothing to see. happy days!
 
Last edited:
I will be using SWA to feed the conservatory, terminating each end from house to conservatory in black wiska boxes as i think they look neat, Then running SWA to feed socket & lighting FCU on far side of conservatory....


Anyway, to cut a long story short, I put a price in for £250 including all labour, Materials and issueing a certificate. I lost the job, Another "spark" has gone in lower and got it, i thought my price was relitivly cheap considering...

Oh well, win some ya loose some
 
I will be using SWA to feed the conservatory, terminating each end from house to conservatory in black wiska boxes as i think they look neat, Then running SWA to feed socket & lighting FCU on far side of conservatory....


Anyway, to cut a long story short, I put a price in for £250 including all labour, Materials and issueing a certificate. I lost the job, Another "spark" has gone in lower and got it, i thought my price was relitivly cheap considering...

Oh well, win some ya loose some
your best off losing that one mate. i wouldnt even consider it for £250 considering the conditions :p
 