Ok i'm sort of half glad you said that Phil, what would have been the better, neater, more professional method of installing those? The floor is made up of 2 layers of 18mm ply with a 3mm durbar steel plat skin, beneath the floor, there are 89mm wide steel Universal beams with 38mm centres and directly below, a massive Gas heating system that has about enough space to get an arm behind the pipe work to drill necessary holes for fixings. Ladder access is very difficult and working space is about 3ft square all around for about 15ft down the wall line as there is a machine spanning the distance directly behind.
I did do these and would like as much
constructive (please) criticism as possible, as i just couldnt see another way around getting them in the location they need to be, without just running cable up the wall for ease of manipulation in the lower levels. I know the cable isn't dead straight and they aren't all perfectly parallel, I was on a serious time budget (3 hours) to get it done before the main commissioning team returned.
I only ask how much would you charge, to get an idea of what Industrial costings look like as its something I am unfamiliar with. I would also obviously like to improve on such installs so would greatly value anyone's input.
I apologise in advance if this install has caused serious offense to more seasoned guys out there