B
BEN5637
what would you charge for chopping in 15 double sockets for a flush finish which are currently surface mount, plaster/brick wall. any advice greatly appreiciated.
plastering as well? do it on an hourly rate if your unsure, I'd think its a days work so 150 to 200
Sounds like a ****ty job to do, could take longer than expected. Maybe it'll be rock solid engineering bricks!! Then again the bricks could crumble away and leave you with nothing to fix to.
What about the cabling? If I were you I'd estimate how long it'll take and then double it, and add a bit on top!!