I have one electricity supply to my house, rated at 15kVA each, another one, largely unused at the moment, but soon to change, and there are two other 15kVA supplies to two other properties all off of the same 25kVA transformer. This has all worked fine for years, but what happens when 7.2 kW EV chargers are required on all four supplies, not to mention heat pumps? The only significant electrical loads in any of the properties are ovens and hobs, but these are relatively short term and bouncing of 'stats all the time, so there's unlikely to be a need for any throttling of the EV supply in any individual property, but if four charge points are each wanting 7.2kW at the same time, which is likely, that, plus any other loads is going to be way above the rating of the transformer for many hours.
I know that looped supplies can be separated at no cost to the consumer, but what happens in a case like this, or, more importantly, who pays? No one is likely to be overloading their own individual supply.
I know that looped supplies can be separated at no cost to the consumer, but what happens in a case like this, or, more importantly, who pays? No one is likely to be overloading their own individual supply.