brianmoooore

~
Esteemed
Arms
I have one electricity supply to my house, rated at 15kVA each, another one, largely unused at the moment, but soon to change, and there are two other 15kVA supplies to two other properties all off of the same 25kVA transformer. This has all worked fine for years, but what happens when 7.2 kW EV chargers are required on all four supplies, not to mention heat pumps? The only significant electrical loads in any of the properties are ovens and hobs, but these are relatively short term and bouncing of 'stats all the time, so there's unlikely to be a need for any throttling of the EV supply in any individual property, but if four charge points are each wanting 7.2kW at the same time, which is likely, that, plus any other loads is going to be way above the rating of the transformer for many hours.
I know that looped supplies can be separated at no cost to the consumer, but what happens in a case like this, or, more importantly, who pays? No one is likely to be overloading their own individual supply.
 
My first thought is ... get in quick and get your charger installed, just in case the DNO gets to a point where they realise a plausible loading scenario (multiple EVs plus heat pumps) is going to overload their transformer and refuses permission to connect. You don't want to be the one who gets there last and can't have a connection.
I've no idea if that's how it would work, but if you are in there first then you'll be alright Jack !

I recall when I were a youngster, our phone line was a party line. There weren't enough pairs into the village and the GPO (as it was then) wouldn't put any more in - so people got party lines. Over in the US, I've read (in other forums), of people being refused a second phone line for the same reason - so they would wait until a house was sold and quickly apply while it was empty in the hope of getting allocated the one (currently) spare pair. The phone company would be forced to install new cable for the new owners of the house when they find no spare pairs, and under an obligation to provide a basic service to any property.
 
The problem with that is that at the moment I have an 'interest' in the other two supplies as well as my own. There are others that I could 'offload' them onto that have a share of the properties that the supplies are connected to, but it would all be a bit complicated if it's unnecessary in the first place.
Aren't the RECs obliged to provide a sufficiently robust supply for all these things the government is promoting? All the supplies are nominally big enough - it's just when they're all loaded up at the same time there might be a problem.
I know what you mean about the get in quick bit. I had an application in for a 50kW wind turbine, just before the previous government stopped all on shore building. £4k a year plus a proportion of the generated tariff (about the same again) for renting a 4m square compound tucked away where no one could really see it. What's not to like?
One of my neighbours got to hear of this, and decided to put in an application of his own. His was passed at the last planning application before the ban, while mine ended up being scheduled for the month after. $!$!=?&, or words to that effect.
 