Just a quick check, as getting sorted today. If submain swa is indeed fed from TNCS source in the office cu and then out to yurt and at that end a metal cu with 2-3 circuits power, interior lights and separately 2 x 20W L.E.D. exterior lights all with rcbo protection and earth from TNCS divorced there through a plastic enclosure or similar and then TT rod earth for the cu in yurt. Would I need a simple mcb for the swa sub main out to yurt, or would that require more ? as only time delayed rcd's I can get hold of locally are double pole main switch type ones which would be not really what I need.