To be honest, the whole thing looks a mess. I personally would call the DNO to have a look at their earth & your suppler to have a look at their tails. Then I would ask the property owner (think that's you), what do they want to do with their tails from the meter to the Henley blocks (i.e. get rid of Henley blocks) and how about supporting that white cable properly, or is it redundant? And quite frankly, the cupboard could do with a bit of a hoover. :-)
 
totally agree it needs a good hoover!! ill make sure the better half knows she is really starting to slack! ;-)

I will call the DNO. I want to get it sorted out because it is a mess!

that white cable is from the house alarm so has nothing to do with anything. Id like to get rid of the Henley blocks. I plan to change the CU, sort tails out and sort the whole thing out. However that will have to wait until I have the right knowledge and experience to do such a job
 
totally agree it needs a good hoover!! ill make sure the better half knows she is really starting to slack! ;-)

I will call the DNO. I want to get it sorted out because it is a mess!

that white cable is from the house alarm so has nothing to do with anything. Id like to get rid of the Henley blocks. I plan to change the CU, sort tails out and sort the whole thing out. However that will have to wait until I have the right knowledge and experience to do such a job
That's told her! Seriously, wouldn't hurt to ask the DNO to have a shufty at their earthing terminal.
 
Called western power. An electrician called and said its not something they deal with because I'm on a TN-S system. If I was on PME then they would come and sort it. They said to call an electrician who can replace the cable. There's enough of the cable to just undo the existing little bit that's connected to the rod and connect the existing cable from the cu board

image.jpg
 
undo the clamp nut and bolt replace cable in 1 piece to the henly/MET with a lug on the end for the clamp.
 
Flipping DNO's. It's their kit, and it looks carp. I suppose the only way you'll convince them is a high Ze reading. Personally wouldn't replace it myself, case it goes bang, when you tighten it too tight! Think you just gotta whinge a bit, if the reading is bad. Common problem it appears, here's one that 'we' prepared earlier: http://www.electriciansforums.co.uk...ctrical-forum/86475-tns-earth-clamp-bust.html. Hepworth clamp, is what you want, I think that's what they're called.
 
Last edited:
The clamp looks as if the screw for tightening is the same as the screw for retaining the cable in place.
Admittedly the clamp looks very loose and appears to be held off from the cable sheath by something, however if you were to firmly affix a cable lug (the cable in the picture looks to be larger than the 6mm² you are referencing in the link to the lug you gave) to the clamp then the force applied to clamp the lug will also be applied to tightening the clamp, if the clamp can tighten enough to compress the cores and damage them then they could short to the lead sheath or each other.

That said it does not appear from the picture as if that clamp can tighten beyond a certain point which looks as if it would still be a loose fit on the cable sheath.

A hepworth clamp needs a special tool to close it and uses an earth braid for connection so is not ideal in this case, a constant force spring would be OK but they seem to be hard to obtain easily at a reasonable price.

Since you have had verbal authorisation from the DNO to change the cable it would be worth looking at the job in detail to see what it entails and only proceed once you are sure it is safe and your resulting solution will be secure and effective.
 