Deleted member 9648

Wired two RCD sockets on a radial today next to a sub-DB in a large factory unit. The new circuit was connected to an existing redundant 20a MCB which had served a control item which I'd disconnected a while back. Now based on the possibly iffy logic that because the protective device was already in place I decided that I'd get away with a MW because I wasn't adding anything to the existing DB.
Truth is I just couldnt be assed to gather the plethora of information required for an EIC to be correctly filled in for such a p***yass job.
A MW seemed more than adequate...Preparing now for a right good telling off.
 
In his words New circuit :D
Yes must admit, missed that mention, just skimmed the post, thinking more about it I'm leaning more your way although it could be argued that because there is an existing CB I change my mind Westy, EIC, it has to be.
 
My view is that Westward is correct in that it's a new circuit and requires a eic if you go by the book.
But I'd probally do as Wirepuller did and issue a mwc for this job, the mcb was already in place and if it supplied a socket already there and you extended it to the 2 new sockets there'd be no discussion, a mwc would be issued.
 
In his words New circuit :D
My view is that Westward is correct in that it's a new circuit and requires a eic if you go by the book.
But I'd probally do as Wirepuller did and issue a mwc for this job, the mcb was already in place and if it supplied a socket already there and you extended it to the 2 new sockets there'd be no discussion, a mwc would be issued.
That was my first thought Andy it's got to be an EIC , a contentious issue.
 
When you think about it a MWC has more than adequate information to certify that this sort of job is safe and fit for purpose. Whereas an EIC would add an hour to the job, nonsense really.
 
It is irrelevant whether the protective device is existing or not it is a new circuit.
 
Just do what most people do and write the results in pen on the wall adjacent to the DB.
You know ze 0.12 etc etc. :rolleyes:

Tho in all seriousness the trauma of trying to take a ze to a functioning installation just because a couple of sockets have been added.
 
Thanks for the input chaps, I think technically an EIC would be the correct thing. The MCB was in place, the previous circuit connected to it had been disconnected, but nevertheless I connected a new and completely different circuit to it.
But I suspect I'll be trying to justify a MW for this sort of thing more and more in the future. As Dave OCD says, the time and effort an EIC now involves is a sledgehammer to crack a nut for this sort of thing. It's really designed for major works or new installations. Whenever I'm faced with compiling an EIC I cant help thinking we need something intermediate between a MW and EIC, say for a maximum of 1 new circuit. I confess in the past I have extended or spurred from existing circuits just to avoid an EIC when compiling one would be a pain, such as in commercial/government premises where access to the required areas is nigh on impossible without a major faf.
 
In a perfect world you could easily get your hands on the most recent EICR and then copy all of the info over such as Ze and the tick boxes to your EIC. Then you'd only have to perform the same tests as you would with a minor works
 