Deleted member 9648
I have done that before FSU, but really that's not correct as you cannot be certain things haven't changed since the EICR was compiled.
In a perfect world you could easily get your hands on the most recent EICR and then copy all of the info over such as Ze and the tick boxes to your EIC. Then you'd only have to perform the same tests as you would with a minor works

Thats assuming the eicr is worth the paper it is printed on and has not been done by a drive by cowboy in his bodge job van.In a perfect world you could easily get your hands on the most recent EICR and then copy all of the info over such as Ze and the tick boxes to your EIC. Then you'd only have to perform the same tests as you would with a minor works
For some reason reminded me of this classic... you came in removed the old cable and replaced it with a new cable and also removed the old accessories on the end of circuit and put new ones in, still the same old circuit just with a new cable and accessories! If the job had been done in stages each one would have been a minor works.

Depends if that means 'Non Applicable' or 'No Access'.For this situation there should a cert for when you are just installing one or two circuits as others as said its not always posible to access the main incoming supply of large installations , You can not put LIM on a eir so what do you do ?fill the report with N/As .

HA ha never thought of thatDepends if that means 'Non Applicable' or 'No Access'.![]()