S

Squid

Some rough drawings in, meeting scheduled in for next week.

Measured drawings have been done a year to two ago before anyone asks.

As is,

Screen Shot 2018-08-01 at 17.57.45.jpg
 
the only books i'm buying in future ( apart from Jack Higgins and Lee Child offerings ) will be the idiots guide to building a mobility scooter.i've already got the power plant... a 250 cc Villiers 2 stroke twin.
 
the only books i'm buying in future ( apart from Jack Higgins and Lee Child offerings ) will be the idiots guide to building a mobility scooter.i've already got the power plant... a 250 cc Villiers 2 stroke twin.

Been done,

 
That loft looks complicated, why not just go up a full storey with a flat roof if there's a height limitation. would probably work out cheaper and give more space.
 
That loft looks complicated, why not just go up a full storey with a flat roof if there's a height limitation. would probably work out cheaper and give more space.
Conservation area so not allowed, I "may" get away by raising the ridge by 15cm full removal of roof will cost £'s and if I could I would build up the party walls and add RSG's across.

Should increase the space from 95m2 to 150m2.
 

OFFICIAL SPONSORS

Back
Top