3.75m per length......I think I'd be regarded as taking the pee at nearly 100 squid a length.....if we're talking big numbers, at least.
It all depends on the degree of difficulty, though.......straight run, 4 saddles and one length....churn plenty of those out per hour.
Machine install, 2 lengths, 2 boxes, a couple of bends (generally natural for me), couplings, bushes......at least four hours. A day, at least, including for adaptation, wiring and completion.
Regarding putting cable in before installing, never done that. Some sort of pre wired kit system, maybe.
It all depends on the degree of difficulty, though.......straight run, 4 saddles and one length....churn plenty of those out per hour.
Machine install, 2 lengths, 2 boxes, a couple of bends (generally natural for me), couplings, bushes......at least four hours. A day, at least, including for adaptation, wiring and completion.
Regarding putting cable in before installing, never done that. Some sort of pre wired kit system, maybe.