not compulsory, but the customer has to "opt out" of having it.

I think Screwfix are trying to sell off their non-spd BG boards on special offers.
Same advert said "buy this, and get 25% off 25mm tails"
Yeh... on blue and brown 6181Y... no mention of the 6491X green/yellow
That’s fine, the ”customer“ is me. I’m a newby electrician, so I thought it best to make all the mistakes on my own house first ?
 
As asked earlier... how many neutral bars are in this bare bones box?

For 2 RCD's, you would need 2 bars... one bar protected by each rcd.

Apologies if this has been answered
 
as previous replies. go the whole hog and fit RCBOs. this will also give you more useable ways than a dual RCD board, and eliminate the need for those dreadful floppy interconnection tails.
 
it's in his own house, so he should go for top dollar gear. RCBOs all the way. notlike us oldies where own house electrics were 80% equipment salvaged from job upgrades. 16 sockets in the house, and never 2 the same. CU that complied 3 editions ago.
 
maybe OP is talking about the internal links to each RCD .
 
maybe OP is talking about the internal links to each RCD .
But how would a qualified electrician not know how to do that? Not bashing him, just confused.

Electrician to electrician questions are usually things like 'are my calculations right here' or 'how would you route this...' not 'how do i get power to a board'. ?
 
Don't know if I'm missing something but there seems to be a lack of job planning on the part of the OP
Surely you make sure you have all the materials and the correct materials to complete the job before starting it, as stated previously by others for me the best route would be RCBO's, to buy a CU with a main switch then populate it with a couple of RCD's doesn't sound a cost effective way to get a dual RCD CU to me
 
As I understand it, the OP is newly qualified… maybe doesn’t know how CUs are supplied, whether had to build them from scratch, buy them populated or part populated… split board etc. Lot to think about if you haven’t done them before.

At least he’s practicing in his own house.
 
As I understand it, the OP is newly qualified… maybe doesn’t know how CUs are supplied, whether had to build them from scratch, buy them populated or part populated… split board etc. Lot to think about if you haven’t done them before.

At least he’s practicing in his own house.
I wonder if, and again no offence OP, he did a shorter course or something?
 