Personally I'd disconnect the neutral rather than main protective conductor to ensure all Earth paths are included. I.S. 10101 mentions this although ET 101 didn't.

The minimum values stated are for the entire installation/DB.
Must be getting our wires crossed here

I'm envisaging all live wires joined at the main board meggering to the MET for the 1st global IR test

If you disconnect MPC link how are you removing earth paths ?
 
Must be getting our wires crossed here

I'm envisaging all live wires joined at the main board meggering to the MET for the 1st global IR test

If you disconnect MPC link how are you removing earth paths ?
You're potentially excluding Earth faults to the neutralising link between the ESB cut-out and the DB.
 
You're potentially excluding Earth faults to the neutralising link between the ESB cut-out and the DB.
Sounds to me like chances of that are slim to none

Anyway cheers ,.do you happen to have a quick description for certs 1, 2, 3 is it, the difference

Also restricted and controlled works makes my head hurt

Is restricted anything that's not minor works ?

Im getting lost on controlled works cheers again
 
Sounds to me like chances of that are slim to none

Anyway cheers ,.do you happen to have a quick description for certs 1, 2, 3 is it, the difference

Also restricted and controlled works makes my head hurt

Is restricted anything that's not minor works ?

Im getting lost on controlled works cheers again
Cert No. 1 is for works requiring DSO (ESB) involvement <50kVA. Cert No. 2 >= 50kVA. Cert No. 3 no DSO involvement.
 
Sounds to me like chances of that are slim to none

Anyway cheers ,.do you happen to have a quick description for certs 1, 2, 3 is it, the difference

Also restricted and controlled works makes my head hurt

Is restricted anything that's not minor works ?

Im getting lost on controlled works cheers again
I hope the following is of practical help.

1)I think you are on the wrong forum here. Very few Irish sparks from ROI on this site. Why not go local? British sparks would not be familiar with the concept of "controlled", "restricted works" etc

2) Your questions suggest you are a little unfamiliar with domestic installation work. Have you done a QC course recently?

3) You will find detailed answers to all the above questions on the Safe Electric website. Go in to "Contractors section" and click on "Technical Information". Its all there.

4) If there is anything there you want more info on, feel free to DM me
 
Like the lady who asked the bus driver

"How long will the next bus be" ?

"The same length as this one"😃
busbroke down. driver has his head in the engine bay. female passenger says " Woluld you like a screwdriver?"
driver replies:

"Of course I would, but let me fix the engine first".
 
I'm not a rec

I've got the verification and certification
You can,t carry out PIR,s if you are not a rec. But if you are a qualified spark you can register to become a rec. If you have done a "verification and certification" course then you have all the basic,s.
Have just checked if you need to log in to access the contractors section in Safe Electric. It's open to the public. They have a good section in there on PIR, s.
 
You can,t carry out PIR,s if you are not a rec. But if you are a qualified spark you can register to become a rec. If you have done a "verification and certification" course then you have all the basic,s.
Have just checked if you need to log in to access the contractors section in Safe Electric. It's open to the public. They have a good section in there on PIR, s.
The REC gets you the QC number once u have the course
You dont have to be a rec to do the pir
 
Personally I'd disconnect the neutral rather than main protective conductor to ensure all Earth paths are included.
In ROI is there not DP switching of the main supply?

Usually here in UK simply isolating it at main CU switch allows global IR just by taking L & N from a final circuit and IR'ing to CPC

In the UK regs IR testing should be done with the CPC connected to the MET so any faults from cable to true Earth (e.g. nail grazing just one live conductor) are included, and not just internal L/N ro CPC faults.
 