Must be getting our wires crossed herePersonally I'd disconnect the neutral rather than main protective conductor to ensure all Earth paths are included. I.S. 10101 mentions this although ET 101 didn't.
The minimum values stated are for the entire installation/DB.
I'm envisaging all live wires joined at the main board meggering to the MET for the 1st global IR test
If you disconnect MPC link how are you removing earth paths ?