From a commercial job i worked on with a small gang of sparks couple year back. Bottom tray had power including all sub mains and t&e power & lighting circuits. Middle rack all Data cat 5 cables and top was for fire/security low voltage cables. This was done to the entire perimeter of building and interlinked to at places, Certain points like this was adjusted to allow heating and ventillation pipes and ductwork through. There must have been miles and miles of metal and then cable once that was laid on this fairly large scale job. There's not many of these sized jobs around my area now for sure!




. I like a lot of your work look very impressive mate top notch!!