I think caution needs to be exercised with regard to the old heaters as to whether they have any asbestos content that will need specialist removal
The last big removal of storage heaters I did 15 or so years ago the heaters had to be bagged, sealed and removed in one by an asbestos removal contractor about 30 heaters over 2 floors with a combined weight of about 8 tonnes.
Disconnected Friday PM asbestos contractor started at 6PM and finished 9 AM Saturday, we did the install of the new heaters Saturday 8AM till 6PM and Sunday 8AM till 5PM, 4 sparks and 2 labourers.
One last thing will the floor where the new heaters are to be delivered to / stored prior to install carry 3 tonnes or will you have to have some one onsite to distribute the load at delivery time to avoid point loading the floor