Neat job, I have a love/hate relationship with cage clamp terminals, we use them a lot in the panels at work. Sometimes they work perfectly, other times can be a real pig to release/insert cables.
Neat job, I have a love/hate relationship with cage clamp terminals, we use them a lot in the panels at work. Sometimes they work perfectly, other times can be a real pig to release/insert cables.
i can see one problem with this...................
A very neat job, one thing that concerned me a bit is the din rail earthed? in the junction box? and why not use a bigger fuse board? You should be allowing for future expansion of the installation, i'm certain in the regs it states a maxium of 70% should be used on a new installation. other than this a really neat job.
This is a panel for grow lights in a greenhouse. Designed and built by us, I shall post some pics of the install as it progresses.
Those cable ties don't seem to be flush cut... I get a slap for things like that... :lol:
A very neat job, one thing that concerned me a bit is the din rail earthed? in the junction box? and why not use a bigger fuse board? You should be allowing for future expansion of the installation, i'm certain in the regs it states a maxium of 70% should be used on a new installation. other than this a really neat job.