honda127

Hi wondering if anyone may have there portfolio that they are finished with as I'm ****ed off with all the nonsense this has caused me , I think it's a disgrace when you have worked for years done 2360 paper 1and 2 ', 2391 and all the rest and still cnt get my jib card, so I'm going to give it a go, I'm willing to give you a few quid for it , thanks guys
 
Hi wondering if anyone may have there portfolio that they are finished with as I'm ****ed off with all the nonsense this has caused me , I think it's a disgrace when you have worked for years done 2360 paper 1and 2 ', 2391 and all the rest and still cnt get my jib card, so I'm going to give it a go, I'm willing to give you a few quid for it , thanks guys

Cant give you my portfolio but more than willing to answer any questions regarding completing your nvq, just drop me a pm.
 
Its not as bad as you think


firstly are you doing it online or via a college

If online using say forum sponser XS training or delta

the there you need to get pics of you doing everything you can and these you will be able to use as evidence to meet the criteria for completing the 8 units 301-308 and can be completed by as little as 3 diaries or you can split it up and do 24 smaller diaries as the 8 units have to be covered 3 times
SWA , T/E, singles 3 containment systems such as metal or PVC trunking metal or PVC conduit basically measuring marking and cutting said systems so if for example you have
a job on a domestic property and your using T/E and singles then you have already met 2 out of the 3 needed for 3 wiring systems out of 6
get pics of you measuiring marking and installing socket outlets switches using red plugs and screws
basically get pics of everything and you will be able to use it as evidence
then you do a write up and attach etc
pictures of you measuiring marking and cutting containement then installing, then installing the wiring and connecting to sockets and similar
installing consumer units or Dbs
carrying outinspection & testing copies of certificates you completed manufacturers info specifications , drawings etc
In your write ups for each of the POS or Key criticals basically you are doing a write up for exactly what you did
Ie i carried out a risk assessment and recorded my findings BLAH BLAH and then you attach picture of you in PPE carrying out a risk assesment
pics of you using power drills safely with PPE using stpladders, ladders and these are 2 of what you need for access systems
before you know it it soon starts to add up it takes time but worth it in the end adn a huge relief lol
Key criticals are things such as you carrying out installing a luminaire using PPE and stepladders or some kind of access system

it seems a lot to get your head round but if you keep doing a little each day you soon get there
Just remember get pics of everything
like 2 relevent people ie picture of you handing over technical or functional information to the customer and 1 with you handing it to the supervisor
pics of you carrying out risk assesment then one discussing you recording your findings etc etc
pictures of you finding and rectifying 3 faults Ie incorrect rings , Low Ir , High resistance etc etc on different equipment and wiring systems such as ring circuit , lighting circuits, motors etc etc

once you have completed say 1 small diary for say the first unit 301 then it gets a little easier 301 and 304 a lot of the evidence is used for both
and when you have completed the 8 units once then your on your way and may find you have completed more than a third as much as half of all evidence thats required
you jsut have to meet the criteria for each unit and then its complete
3 out of 6 access systems so if you complete all 3 in 1 diary basically you have covered 3 access systems but you will still have to complete the units 3 times but if say you have completed 90% on your first 2 diaries then your last set will only need whats missing in whichever unit to complete 100% of the NVQ

any questions post them up and sure there are enough on here to help out basiclaly its no use you having someone elses diary as you have to write it up in your words for the specific work you are doing
If you need a sample diary to show basically what you need to write up then there are some available

If your using Xs training they have them for free use and examples of how to complete the diaries on line
college may be different others may know better

good luck
 
Last edited by a moderator:
Fantastic post brucelee, well worded.

All i can add to that is, its a pain in the arse doing it - but once you've completed it and got the cert, its a relief - a course well worth doing.

i did 3 big diaries, with pictures of literally everything - must of took 1000pics over the 3 diaries no joke. You're got to do the cable calcs and volt drop calcs aswell as everything bruce described above.

One of my jobs was installing a lighting circuit in a housekeeping block on a caravan park....i did it in conduit and it looked stupid - because it was a new block and i could of buried the cables (like anyone normal would) - it was just to forfill the needs of the site diaries, making sure i'd covered everything i possibly could in the 3.

I'd just like to point out, that my old man had agreed this with the client (manager of the park) and he was happy for it to be done that way to aid my studies, what a lovely fella ha.
 