C
chrish_1977
Had a "discussion" with another spark I work with today, he was going to cable tie the water bond cable to the gas pipe and run it along its length to the met. I said that I didn't think that was allowed. But he is adamant that it is ok. Am I just being a bit of a numpty or is there a reg to back me up