LlandrilloSpark
Glenn we are not here for what this guy wants, well it never used to be like that m8, he had 5/6 issues , he should take them up with the spark not us
Thank you all for your comments, where to start with a reply?
The CU with RCBOs was my idea not his he wanted to fit a split CU with a RCD but you lose 2 ways when you spit the CU and space is a problem OK for 12 way, 16 way just and anything larger would require a change to the meter cupboard.
And a very good choice too, don't let anyone here convince you otherwise. It is by far, a superior arrangement compared with the compromise split CU
Bonding the water pipe is a problem area as I can not have the join plastic to metal in the kichen so stop cock under the kitchen sink is out.
Reading the regulations
Where practicable the connection to the gas, water, oil, etc., service should be
within 600 mm of the service meter, or at the point of entry to the building if
the service meter is external and must be on the consumer's side before any
branch pipework and after any insulating section in the service.
There must be some lattitude here other wise why say "practicable" and "should" does not mean has to be or am I reading this incorrectly.
There is, but it should in essence conform with the points made above. It's basically to cover any plastic pipework being subsequently installed...
I could understand there being issues if compession joints or screw threaded joints are used on metal pipe work as this could introduce a path of higher resistance but soldered copper pipe work should not present such issues as it should be a good path with very little electrical resistance. That does assume they joints are soldered correctly but if they were not they would leak.
You do not need to bond copper/metal pipework that is being supplied from a plastic incomer. The idea is to bond metal pipework that is bringing into the property, an extraneous earth path. So any copper pipework after an incoming plastic pipe, would be isolated and not require bonding. This can be proved by testing ...over 23k ohms and it doesn't need bonding...
In fact if over 23k ohms it ''Shouldn't'' be bonded, ...as doing so, can actually introduce a potential during a fault condition.
It may be possible to have the bond in the bathroom as the basin is on a cabinet and all the taps are mains fed including the hot water. Will need to look at distance from join to cabinet but it will not be anywhere close to the plastic stop cock just close to where it goes from plastic to metal.
As above comments...
May be I should have done all the water pipes incuding the heating in plastic then the problem would not arise
Will be using metal CU's as that is not a problem or going to cost an arm and a leg and should make a tidier job.
Metal or plastic, the choice is yours..
As for leaving the electrician alone to make decisions on what goes where, not a chance as I know where the sockets, switches need to go, that does assume the positions meet the current regulations or there is another reason for them to be postioned else where.
I have good understanding of electrics although not quailfied as such and had I been younger would have done the work myself and just had it signed off at the end.
Officially your not allowed to actually do that anymore and you would probably have a job trying to find someone to sign it off for you!! lol!! Now you would have had to go through the LABC, and that can be costly.
BTW: I am not looking over his shoulder as the job is 160miles away so can only get on site about once a week and just because someone is quailified does not mean they can not make a mistake, we all do but try our best not to.
Going to have to say this...
Threads like this make my blood boil, we are not "Sparkwatch", yes we can answer queries from homeowners ect but we are not here to cast judgment on a fellow sparks work via a third party, especially one who talks like he has had his head in BS7671.
Not impressed
I'm not asking anyone to be a "Sparkwatch" and I'm not trying to cast any judgement on anyone or upset anyone, as you do not know the person doing the work then how can you say "one who talks like he has had his head in BS7671".
All I'm trying to do is ensure the job is done correctly and within the current regulations how else do you check work being carried out is done correctly. Also it appears the regulations are a little ambiguous or at least not as clear as they could be and leave some of it open to interpretation rather than a cast in stone rule. As technology and materials move forward things change and as some of the stuff available now was not around or at least not in common usage when the regs were put together.
Going to have to say this...
Threads like this make my blood boil, we are not "Sparkwatch", yes we can answer queries from homeowners ect but we are not here to cast judgment on a fellow sparks work via a third party, especially one who talks like he has had his head in BS7671.
Not impressed
Well I don't know much about the job because I haven't seen it or met the electrician carrying out the work, but I'd be more than happy to stick my beak in and comment on something I don't fully understand.I'm not asking anyone to be a "Sparkwatch" and I'm not trying to cast any judgement on anyone or upset anyone, as you do not know the person doing the work then how can you say "one who talks like he has had his head in BS7671".
All I'm trying to do is ensure the job is done correctly and within the current regulations how else do you check work being carried out is done correctly. Also it appears the regulations are a little ambiguous or at least not as clear as they could be and leave some of it open to interpretation rather than a cast in stone rule. As technology and materials move forward things change and as some of the stuff available now was not around or at least not in common usage when the regs were put together.
In years gone by maybe!! ...Now day's it is just as likely he is a fast track wanna-be electrician!! lol!!
And that's just the trouble, there is no up front distinction between the fully trained and experienced and the under trained inexperienced guy that turns up on your door step!!
Exactly - none of us have seen the job either. The general idea is that a customer hires a tradesman because they know what they're doing, and will have reasons for doing things the way they do. If the customer is not confident that their tradesman is competent, they could pay for an inspection from the local authority or pay the electrician off and try to get someone else in to finish off what they started.I don't understand why you guys are getting at the OP, he sounds clued up eñough to want to be sure his spark is doing the right stuff.
You have no idea if the spark is a spark, if he is 17th qualified or jûst blagging it, Electrical Trainee or time served.
You make your feelings well known about those sorts but when someone wants to be reassured that their spark is doing things right you hjump on them as well!
Consistent if nothing else