Recent content by L1Jay1

  1. L

    Can u be taken to court for EICR 13 months after it was issued

    Can you be taken to court for an EICR by a house purchaser 13 months after EICR was issued, house purchaser has had there own report done 13 months after original was issued. House purchasers EICR was a more detailed one done over 20 hours costing £600. I think this report is incorrect after...
  2. L

    2391-52 practical exam help

    Just taken 2391 practical and failed it , my brain stopped functioning , didnt realise i was going to find it that difficult , normally testing isnt a problem for me. Was told on exam that i only needed to test one lighting circuit , the was a one way and a two way lighting circuit . couldnt...
  3. L

    UK storage heaters

    There connecting the control to the ring and the heater to the off peak supply and connecting to a existing FCU , sometimes the circuit is altered if the heater has to go in another location . But there not installing an RCD in situations where the is no RCD protection in the house . Sometimes...
  4. L

    UK storage heaters

    A company doing goverment grant installations wants them put on a existing ring and without RCD protection in houses that don't have any RCD protection.
  5. L

    UK storage heaters

    Do storage heaters need to go on own circuit
  6. L

    sockets

    Is it still ok to mount sockets on skirting boards , I know the regs state 450mm off the floor, if customer says they don't want them that high in there home , is it ok to go with the height that they want them at , cable is to be surface mounted in trunking . Its to be a new radial circuit in...
  7. L

    UK secondary gas meter

    The primary gas meter is earthed to the main distribution board , but the gas meter is outside, the pipe work is on the outside goes down the side of building. flat has its own cu . secondary gas meter is bonded to other pipe work inside the building but not earthed to the flats cu.
  8. L

    UK secondary gas meter

    Does secondary gas meter to be earthed .
  9. L

    UK best way for isolation

    im not ignoring the advice , clearly protecting each sub main with an MCB is not the way to go about it.
  10. L

    UK best way for isolation

    yea im a professional, but not taken on this type of job before, the landlord is trying to save money, i think hes realised that hes going to have to get this work done, i also need the work at the moment so its difficult to turn down, i trying to go along with what he wants yea i am a...
  11. L

    UK best way for isolation

    Each flat will have its own consumer unit covering 3/4 circuits, there not large flats, more like studio flats, there will be a means of isolation in each flat via the flats cu , just wondering the best method of providing isolation at the main board, does there need to be individual isolation...
  12. L

    UK best way for isolation

    Lands supply amd meter .
  13. L

    UK best way for isolation

    there isn't a FA system at the moment ,
  14. L

    UK best way for isolation

    ok thanks for reminding me, ill have to do later

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock