Recent content by L1Jay1

  1. L

    Can u be taken to court for EICR 13 months after it was issued

    Can you be taken to court for an EICR by a house purchaser 13 months after EICR was issued, house purchaser has had there own report done 13 months after original was issued. House purchasers EICR was a more detailed one done over 20 hours costing £600. I think this report is incorrect after...
  2. L

    2391-52 practical exam help

    Just taken 2391 practical and failed it , my brain stopped functioning , didnt realise i was going to find it that difficult , normally testing isnt a problem for me. Was told on exam that i only needed to test one lighting circuit , the was a one way and a two way lighting circuit . couldnt...
  3. L

    UK storage heaters

    There connecting the control to the ring and the heater to the off peak supply and connecting to a existing FCU , sometimes the circuit is altered if the heater has to go in another location . But there not installing an RCD in situations where the is no RCD protection in the house . Sometimes...
  4. L

    UK storage heaters

    A company doing goverment grant installations wants them put on a existing ring and without RCD protection in houses that don't have any RCD protection.
  5. L

    UK storage heaters

    Do storage heaters need to go on own circuit
  6. L

    sockets

    Is it still ok to mount sockets on skirting boards , I know the regs state 450mm off the floor, if customer says they don't want them that high in there home , is it ok to go with the height that they want them at , cable is to be surface mounted in trunking . Its to be a new radial circuit in...
  7. L

    UK secondary gas meter

    The primary gas meter is earthed to the main distribution board , but the gas meter is outside, the pipe work is on the outside goes down the side of building. flat has its own cu . secondary gas meter is bonded to other pipe work inside the building but not earthed to the flats cu.
  8. L

    UK secondary gas meter

    Does secondary gas meter to be earthed .
  9. L

    UK best way for isolation

    im not ignoring the advice , clearly protecting each sub main with an MCB is not the way to go about it.
  10. L

    UK best way for isolation

    yea im a professional, but not taken on this type of job before, the landlord is trying to save money, i think hes realised that hes going to have to get this work done, i also need the work at the moment so its difficult to turn down, i trying to go along with what he wants yea i am a...
  11. L

    UK best way for isolation

    Each flat will have its own consumer unit covering 3/4 circuits, there not large flats, more like studio flats, there will be a means of isolation in each flat via the flats cu , just wondering the best method of providing isolation at the main board, does there need to be individual isolation...
  12. L

    UK best way for isolation

    Lands supply amd meter .
  13. L

    UK best way for isolation

    there isn't a FA system at the moment ,
  14. L

    UK best way for isolation

    ok thanks for reminding me, ill have to do later

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go