    A guy I used to work with, I shall call him John for that is his name, sent me this picture last week. He found it while roaming the net. Why send it to me? Well, twas John and I that did it. We were working either at West Burton or Cottam power stations and drove past the sign every day. On the...
  2. M

    how to test expensive audio engineering equipment appropriately

    Hi there, I recently completed a PAT Course and have been working on increasing my experience testing various kinds of equipment. I have a lot of questions around how to test expensive audio engineering equipment appropriately. Thankful to have found this forum!
  3. C

    eicr coding on tt system with some earthed and some non earth parts

    Need some help with an EICR,.It's a TT system (6.2 ze) . The issue is that it has 1 lighting circuit, some of it is run in old 2 core with no earth-fine, at the time. then we have some run in later new colours T&E , this is not earthed either, don't know when this was installed but could be 20...
  4. M

    EICR Code

    So big hole at rear of CU.. right next to nice dry timber. I feel like a C3 is appropriate, but is there any legitimacy in coding it a C2?
  5. happysteve

    SOURCE FILES for IET model forms (18th Edition, amendment 4) - for tinkerers only!

    If you just want to use the PDF forms - MEIWC, EIC, EICR, test sheets - then please download the files from this thread: https://www.electriciansforums.net/threads/18th-edition-amendment-4-2026-pdf-forms.222429/ This thread is for those who want to try tinkering with the original source files...
  6. Moley

    News Money talks!

    My wife has been waiting for a cataract operation for a long time. She went for a preop early this year then waited. She phoned up the nhs a few months later and was called in for another preop and told the first eye would be done before our holiday in July. We waited and before our holiday was...
  7. littlespark

    Whats going on?

    I've been a bit quiet lately... but just been busy, so not a bad thing. Family is good... Daughters have been sorting themselves out. Eldest is back from her 2 years teaching in South Korea... So that's her on the job market... Suitcase contents lying all over the house already. Middle one...
  8. R

    EICR C2

    Looking for some input/opinions on a recent EICR resulting in a C2 for a consumer unit. Current conditions are plastic CU, in good condition, no damage, no faults, all MCB and RCDs (not RCBOs) in good working order. The premise is a rented flat. It is 5 years since the last one where this was...
  9. V

    Reducing 10mm T&E to 6mm T&E BS7671 433.2 Compliance

    I am planning to repurpose a 10mm T&E cable that was used for an electric shower to connect up a new cooker/hob in a new kitchen/diner currently being built in my clients house. It was connected back to a 40A RCBO, and I could just extend it all the way to the new position in the kitchen, but...
  10. K

    Joke Paid the subscription? How to get rid of the adds?

    As per title, paid the 12quid. Forum is barely use-able otherwise. Still getting battered with ads though?
  11. littlespark

    EICR question

    I have been privy to looking at a recent EICR at the factory where my middle daughter works. It’s a rented unit, so the landlord organised the test. My question is, what code, if any would you give these items. This is all that was found Type AC instead of type A RCBO’s Plastic CU (IP...
  12. O

    Hobby Dealing with apprentice leaving.

    I know this is a bit soppy but this must have happened to lost of people over the years, there are two of us in the firm and 3 years ago we took on an apprentice, he actually left after a year to go traveling but came back and started where he left off. He picked everything up really fast, had a...
  13. HappyHippyDad

    EICR coding? Again :-)

    There are a few codings which I am unsure about. I have given the codes I feel are right. Its a TNS 1. The main consumer unit is a dual RCD board. However, this has been altered by someone to squeeze in a 50A MCB on the right hand side. This 50A MCB has a 16mm twin and earth from it, which...
  14. N

    is this an eicr fail

    is this a fail or a notice that an upgrade is needed, in a cupboard with a 30min fire door on it ,in a flat lobby
  15. S

    EICR questions ...

    A couple of random EICR questions - insurance insists on a scam member, I'm not. The guy doing the EICR is a friend of a friend, and I don't want to pee him off, but I disagree with some details. To be fair, there's nothing major I didn't already know about and we have plans to deal with. What's...
  16. littlespark

    Impossible EICR

    I went this morning to test 2x flats belonging to my wifes aunt.... in different blocks, but on the same street. The other flats are a mix of housing association, and private owned/ private let. Started off in the kitchen, with an earth loop on the cooker circuit, and noticed it was a bit high...
  17. Old Tiler 180581

    EICR unsatisfactory - subcontracted work and quote for remedial work

    We have had an EICR completed on our home. Firstly, the electrician which we instructed has subcontracted out the work to another. Whilst the electrician who has signed off the report is NAPIT registered, the electrician who completed the work/report is not. This subcontracted company are not...
  18. littlespark

    News blood donors and birthday on the same day

    Yeh... that was bad planning by the SBTS..... Every time, different nurses and staff... "can you confirm your name and date of birth?....... Oh.. today? Happy birthday....... take an extra biscuit.." Every single time... Then, ooh, donation 64.. .thats good... either arm? ok.... lay...
  19. happysteve

    18th Edition Amendment 4 (2026) PDF forms?

    Eh up :) Any pressing need for me to make new PDF form versions of the Amendment 4 EIC / EICR / MEIWC forms (based on the IET model forms in Appendix 6)? Or is everyone using proprietry software that you rent (or pay per form) to fill them in nowadays? It's a faff to update the PDF ones, it...
  20. N

    eicr C2 and FI

    Ive been asked to have a look at a remedial work quotation provided by a company and I'm confused at a couple of things they have brought up. 1st thing is there are 3 circuits that have "no continuity of ring final conductors" fair enough...2 of the circuits are classed as C2 and one as FI...