HI GUYS
LOOKING FOR SOME GUIDANCE PLEASE AS IT SEEMS TO BE A BIT OF A GREY AREA.
I AM AN ELECTRICIAN AND HAVE BEEN FOR 20 YEARS (COMPETENT).
IVE RECENTLY SET UP BUSINESS ON MY OWN AND HAVE BEEN ASKED TO REWIRE A DOMESTIC PROPERTY THAT IS BEING RENOVATED.
SO MY QUESTION IS 'DO I NEED TO BE...
MATTMGM
Thread
building
control
electrical
electrical work
off
qualifications
signing
works
Hi all,
Just has a new gas meter fitted at our factory.
Was left an advice notice that there was no earth bond within 600mm of meter outlet.
The problem with this is the meter is 20 meters away from the building in a little 1970s hut all on its own with a paved parking area in between. The...
Evening all.
Bit of an odd one this and I just wanted to run it past bigger brains than mine to make sure I'm not missing something obvious.
A brand new PME supply is being brought across to a field which has got 3 outbuildings, all of which need lights and a couple of sockets.
The supply...
The General
Thread
bonding
building
conductor
earthing
outbuilding
size
supply
water
water bond
Evening..
I have been trying to think of the best way to attach a bonding clamp to a steel structure and could do with some opinions please.
At present I am thinking of a bolt through one of the steel columns and attach the clamp to this, but I'd rather get the clamp on a smooth surface...
Been asked to quote for a mates mum for a job after my holiday! and my niceic assessment (29th!!)
Basically she is getting one of them large wooden cabins at end of her garden and she wants a quote for the electrics to be installed..
In the house she currently has a 5way 3871 straight board...
Does anyone know of any good courses for panel design, building and fault finding, that isn't a HND or any ways to for me to continue learning? I'm based in the north west if any one knows of any courses or people looking for this type of spark.
Any help greatly appreciated
Cheers!
We've just installed a new 3-phase PV system onto a rebuilt community centre, where the pan is to bring in a new 3-phase supply. The new supply has been delayed, and the clients want to get the building up and running.
We can easily use a single phase conversion kit in the DB to provide power...
stevie gill
Thread
buildingbuilding control
control
inverter
issue
panels
phase
single
string
Hi all,
so I have been working for an electrical company for several years now and every test we do Is covered by our employer under the nic eic. I have also acquired private work mainly family and friends, my question is how do I go about testing and certificating? being nvq level 3...
This gets a bit complicated so bear with me. Basically i have 2 rural tt supplies. One is to a large farm shed with PV solar 3.6 kw on the roof and is not used much.
the other is a large house and pub combined which has a shared supply transformer with a nearby bungalow. I m not concerned...
Hi,
I left electrical work for another field of work over 25 years ago, but now would like to return. Probably self employed domestic work.
I know I would need 17th Edition and this new Part P. - I have to say Part P seems like a money making scheme. If you've completed an electrical...
Grosvenor
Thread
before
building
edition
electrical
electrical work
getting
retired
sparky
work
Hi, this is my first post so sorry if I miss some of the etiquette that usually accompanies these questions.
I'm also slightly embarrassed to be asking it, as I'm sure I already know the answer.
I have a contract for a company that install timber framed out buildings in peoples gardens, (30...