R

RyanCheetham

Basically i did these terminations using Wagos for a garage into bathroom conversion. It is in a regular surface mount 35mm MK pattress with blanking plate and is in the void above the cieling and accessible by a loose floorboard in a cupboard above. The client now wants to laminate through this cupboard. Could this setup be lost under the floor or should i try and stop them? Cheers
 

Attachments

  • 20121024_095851.jpg
    20121024_095851.jpg
    234.2 KB · Views: 203
I've done that countless times and always use exact same method , I suppose it's a hidden junction box but are those connections going to cone apart?, I doubt it, are they simple extensions of a cable or lighting or a spur?, might be worth noting on a cert they are there, some will argue crimps and heat shrink are better, personally IMHO I prefer wago
 
Are Wagos MF -From memory Im sure they are - if so then cover away - all MF connections can be lost without worry.
As said above I doubt they will come lose so dont worry
 
With all the Digi cameras and Usb storage sticks, it would make sense nowadays for any house undergoing improvements to keep a photo record of things like this for the future, maybe stored in a compartment in the c.u for example. And another one for plumbing.


Sorry just dreaming, none of the above would ever happen in reality.
 
Are Wagos MF -From memory Im sure they are - if so then cover away - all MF connections can be lost without worry.
As said above I doubt they will come lose so dont worry

It takes more than just the connectors to make an MF connection, as the enclosure has to comply as well (that box doesn't). I would simply change it to a couple of Line enclosures with their MF kits and you can forget it then.
 
personally, i think it's fine. if it ever does have to be accessed, then the laminate or the ceiling will have to be cut.
 
How did you manage to squeeze those cables and joints into the box in the first place? I would recommend replacing it whatever happens for one with a lot more room, just my view.
 
It takes more than just the connectors to make an MF connection, as the enclosure has to comply as well (that box doesn't). I would simply change it to a couple of Line enclosures with their MF kits and you can forget it then.

Strictly speaking you may be correct, but in practice, since the cables are clipped close to the enclosure and the connectors are Wago, changing the setup would not result in a better solution.
 
Strictly speaking you may be correct, but in practice, since the cables are clipped close to the enclosure and the connectors are Wago, changing the setup would not result in a better solution.

Totally agree. Just stating what is required. I don't make the rules...... but if I did, oh the fun I would have... :)
 
It takes more than just the connectors to make an MF connection, as the enclosure has to comply as well (that box doesn't). I would simply change it to a couple of Line enclosures with their MF kits and you can forget it then.
or a wago box....as he`s using wago`s......
 
My OCD brain is struggling with the fact the clips are not of the same orientation. I cant look at the picture anymore without cringing
 
The idea of the 3 plate system was to do away with hidden connections in JB's Etc under floor boards etc so if there was a fault they can be traced , so I believe they should be somewhere assessable, how many of you have a fault on a circuit in JB's under floor you cant find ?
 
Last edited by a moderator:
Ryan, by the book it's not maintenance free, and based upon what you have said re location should have been from the get go. So, going strictly by the regs you should change it to an MF arrangement. However, imho I would make sure it's position is noted on the cert and at the DB and move on. And neat job btw, despite Wade's ocd!

Regards
 
Yeah, not the way I'd do it either, but I'm not goin to slate the guy for it (still think it might be a touch of ocd though :tongue3:)

Can't believe I've just noticed your footer for the first time - lol!
 