W
Wilko
There may be a slew of other regs, but 543.4.3 seems to prohibit this circuit arrangement.
@JK-Electrical NICEIC Approved Contractor's status doesn't mean it's clean of cowboys, there are plenty of them I can assure you. Local to me I've seen a recent rewire - no bonding, 100mA up front RCD the only RCD and 40A MCB for Ring Final Circuit installed by a NICEIC AC. Oh, and some diagonal tracking on the same job.
Another local to me seems to have no clue to what safe zones are as cables drop down a foot then go horizontal and back up to next socket on kitchen installs.
You'd have much more joy getting them to take action against someone not registered (paying their fees) that use their logo than you would against bad, terrible, downright dangerous workmanship from someone that pays their fees. The wall of shame only has them naming and shaming non fee paying logo users, nothing for horrendous workmanship by members they have kicked out.

So the way i read the post is the lights were working.
He changed the lights and now nonof the lights work.
Yeah, right neutral cable must have snapped ???