Hello all

I've been a member here for quite awhile, but seldom post due in part to some of the idiots that post on such forums.
I'd forgotten I was able to get into this section of the forum, lol

As the title suggests, I have a question to any of you that point price. Where do you get your prices from? By that, I mean do you pluck a figure from the air for like a flush mounted double socket, or is there some kind of calculation behind it?

I have tried point pricing in the past, but never felt overly comfortable with it. American electrical contractors do this and call it 'Flat rate' pricing. Seems to work well for them and I know that points are calculated based on line item pricing. Every piece of material has a cost and labour time associated to it. Points as we call them are known as 'assemblies' to them.

Be interested to hear your methods.
 
To do it properly is initially a bit time consuming but will mean that you price it correctly. you have to work out every detail for example - time taken to chase in socket x amount at hourly rate. Length of cable average of say 5 metres at x per metre. Price of two screws and rawlplugs at x amount. Cost of single or double socket and backbox....add the total up and that is your price point per socket. Then do the same for lightswitches, plastic or metal fixings, soft and hard brick or surface mounted.
 
As timo says it can be a time consuming exercise, and I think estimating in this way takes a hellava lot of experience however I know some guys who charge between £30 & £50 per point obviously if some one wants a spur in the kitchen £30 quid aint gonna cover it I simple say my rate is X per hour and your looking at x days plus materials unexpected issues may extend the time/cost and I make sure they understand exactly what I mean
Pict
 
I'm not a domestic sparky but I would imagine pricing per point would make more sense on new-builds where you'll probably make on the swings what you lose on the roundabouts. I think it would be a dangerous game doing it for existing installations that need minor additions or alterations because these such big differences depending on the individual house.
 
If its a small/medium domestic job I usually think of a figure that seems right for the house and the customer and feels right to me.
 
Don't see how you can make point pricing work when house bashing.
There's always something round the corner ready to trip you up and delay you.
Prefer to work on hourly rate and keep customer informed of any delays. Never yet had to quibble over final price.

I can see on new builds that it'd work mind.
 
So i take it none of you are 'point pricers'?
This was a question FOR 'point pricers', lol ;)
 
Nope.Got a job just now doing extra points but no main bonding and needs an RCBO as no RCD protection.Priced it as a job.Now she wants all the new sockets and one of the old ones chased in so price gone up again.
 