Long story short I was asked to rewire my girlfriends parents holiday home. They are having major building work done and I said to them weeks ago before the builder started to pass my details on so I could discuss time lines with the builder.
This never happened I have been asking for weeks if the builder needed me to go down and first fix.
Found out today the builder said he would do the wiring at extra cost which he has done but due to me rewiring the rest of the house and upgrade the fuse box he is leaving the cables for me to connect up. This is the shower circuit and lighting circuit.
If I was doing this for a customer I would refuse to connect the builders cables but this is for family. I'm not happy connecting and carrying out a a installation certificate covering his cables
Any suggestions of how to deal with this would just listing in the extent of installation box that the shower and lighting circuit was installed by 3rd party
Would that cover it ?
Any suggestions gratefully received
Just had a row with the girlfriend cos she saying the builder had to do the electrics because I wasn't around. Eventhough I had been asking for weeks to speak to the builder and the progress of the building work
This never happened I have been asking for weeks if the builder needed me to go down and first fix.
Found out today the builder said he would do the wiring at extra cost which he has done but due to me rewiring the rest of the house and upgrade the fuse box he is leaving the cables for me to connect up. This is the shower circuit and lighting circuit.
If I was doing this for a customer I would refuse to connect the builders cables but this is for family. I'm not happy connecting and carrying out a a installation certificate covering his cables
Any suggestions of how to deal with this would just listing in the extent of installation box that the shower and lighting circuit was installed by 3rd party
Would that cover it ?
Any suggestions gratefully received
Just had a row with the girlfriend cos she saying the builder had to do the electrics because I wasn't around. Eventhough I had been asking for weeks to speak to the builder and the progress of the building work