mrloy99
-
- Reaction score
- 15
I was reading some guidance notes on the 17th eddition today and I see that (once again) we are now advised to use the steelwire armouring as the cpc.No longer do we have to install a separate cpc.
I also noted on steel conduit/trunking systems we are now being told that the conduit/trunking itself is now considered to be the prefered circuit protective conductor.Also same as we did in the 15theddition.
I;m showing my age here,but maybe when the 18th eddition comes in,lead and paper cables will come back in fashion.
I also noted on steel conduit/trunking systems we are now being told that the conduit/trunking itself is now considered to be the prefered circuit protective conductor.Also same as we did in the 15theddition.
I;m showing my age here,but maybe when the 18th eddition comes in,lead and paper cables will come back in fashion.