Hi everyone,

My next job is working on price wiring above an office ceiling. I would like to know what you lot think is the best thing to use. I think investing in a cable rod set would be too flimsy so thought of getting a set of drain rods as they are sturdy and can be packed away easily. Or do you think just a length of plasic conduit? We would be pulling in one network cable flying above everything and tying to whatever is available.

Thanks in advance.
 
I've heard network "installers" use some kind of gun which fires a sticky dart across the room, which has the end of the cable attached to it. Dunno how much truth there is in that.
 
Network installing eh ? don't forget to not support the cable in any way shape or form. If you can wrap it round some heating pipes or weave it through some electrical cable all the better. This seems to be the accepted installation standard anyhow.

Serious head now
One network cable ? If there is enough room above the ceiling, pop your head and arm up, coil it up with some slack and give it a chuck. Go retrieve and repeat.
If it's tight and busy up there then a length of conduit is usually the best bet. I have used trunking lid and rods in the past but they can be a bit floppy.
 
I've got just over 500 units to wire a network to. My plan is to wire a complete row of units and pull a loop at each one. I know it sounds nasty tying to whatever I can but there is no containment in and the client accepts this is the only way. Thanks for your ideas lads.
 
The best tool ive got for those tricky wiring issues is called my apprentice .... why bark yourself when you have a dog :)
 
Cables supported correctly throughout the run ( 522.8.5) band 1 cables segragated from band 2 (528.1) cables segragated from non electrical services (528.3) and throwing a cable above a ceiling bad practice a point worth thinking about in case of fire in building the fire service are in there ceiling gone cables that firefighters could get tangled up in
 
Cables supported correctly throughout the run ( 522.8.5) band 1 cables segragated from band 2 (528.1) cables segragated from non electrical services (528.3) and throwing a cable above a ceiling bad practice a point worth thinking about in case of fire in building the fire service are in there ceiling gone cables that firefighters could get tangled up in

That's all well & good for power cables, but, it does not apply to data cables & data cable installers as they can ignore BS7671 as they are not installing power cables, like it or not, think that this is right or not, this is what they do.
They do not care, or pay heed to any standards, they just do it as cheap as they can.
 
I would go for super rod kit as well. Also is there no way you can install the cables so they are completely detached from the actual suspended ceiling even if it is only some tie band or something similar, I thought there was now a law which prevented you from laying cables across the tiles or even tie wrapping to the suspension wires, following the death of a fireman who while entering an office fire got entangled in the wiring that came down when the ceiling collapsed it must have been an horrific way to die, all because some joey had just thrown the cables up there, and it must be a metal type of support , because tie wraps just melt in the event of a fire.
I don't mean to depress you rmc, it is just something to think about while doing installs like this.
 
Not a law, per se, but if it happens & you installed the cables then you will be held liable for manslaughter.
 
Sounds to me like good experience for an apprentice leave it with him whilst you do another job :cool:
 
Not a law, per se, but if it happens & you installed the cables then you will be held liable for manslaughter.

your probably right Paul, I can't remember where I saw the article, maybe professional electrician or the supplement switched on, and I thought it said about bringing in a law or maybe introducing it into the regs, either way it gave me food for thought after reading it.
 
Reminds me of when an 'Alarm Engineer ran his security alarm wires within my basket and tray work full of my power cables, when i did the completion certificate i noted it didn't comply with segregation of band I and II cables .. the owner questioned it i explained and he got on the blower to alarm company ..

Alarm bloke walks in next day cursing me from around the corner to staff not knowing i was there he soon shut up when i went around and ripped him a new A-hole expressing his own codes of practice he needs to follow and how pst off i was he had compromised my installation to save time, he played the ignorant card saying he was unaware to which i said that he should then be supervised by an Alarm Engineer that knows what hes doing --- he went red faced and mumbled an apology well an attempt at one... i actually knew he was self employed thus the company boss but i let that one go as i'd made my point clearly ;)
 